This is the X3T9.2 document register from 1987 to the present in reverse 
order.  Document numbers are of the form:  

X3T9.2/yy-nnn Rev r

   where:   yy is the year
           nnn is the "n"th document of that year
             r is the revision number [original documents do not have a
                                       revision number (i.e., rev 0)]

On the SCSI BBS, electronic versions of these documents, if available, have
filenames of the form: yy-nnnRr.eee, where eee is one of several file
extensions indicating the file type.

This file contains the document number, date, author, mailing date (in []),
description, and resolution of documents starting in 1987 through the present.
On older documents, the resolution field may not be entirely reliable and, in
general, one should refer to the minutes of the appropriate meeting for 
complete information regarding the resolution on a document.

X3T9.2/92-110          Date: 4/13/92  Author: D. Smythe  [5/14/92]
Desc: IDE (ATA) Document Changes
 Res:

X3T9.2/92-109          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Medium Changer Commands
 Res:

X3T9.2/92-108          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Graphic Commands
 Res:

X3T9.2/92-107          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Stream Commands
 Res:

X3T9.2/92-106          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Block Commands
 Res:

X3T9.2/92-105          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Core Commands
 Res:

X3T9.2/92-104          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Architecture Model
 Res:

X3T9.2/92-103          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Fiber Channel Protocol
 Res:

X3T9.2/92-102          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Serial Bus Protocol
 Res:

X3T9.2/92-101          Date: 5/1/92   Author: I. Dal Allan  [5/14/92]
Desc: Project Proposal for SCSI-3 Generic Packetized Protocol
 Res:

X3T9.2/92-100          Date: 5/4/92   Author: D.W. Spence/L.Lamers  [5/14/92]
Desc: Minutes of April 1992 SPI meeting
 Res:

X3T9.2/92-99           Date: 4/13/92  Author: I. Dal Allan  [5/14/92]
Desc: Connector Agenda Items
 Res:

X3T9.2/92-98           Date: 4/29/92  Author: M. Freeman  [5/14/92]
Desc: IEEE P1285 PAR
 Res:

X3T9.2/92-97           Date: 4/27/92  Author: B. Ham  [5/14/92]
Desc: Requirement for Glitch Free Power Up/Down
 Res:

X3T9.2/92-96           Date: 4/27/92  Author: T. Asami  [5/14/92]
Desc: Pin Capacitance of a SCSI Controller LSI
 Res:

X3T9.2/92-95           Date: 4/29/92  Author: L. Lamers  [5/14/92]
Desc: Minutes of the April 1992 X3T9.2 Plenary Meeting
 Res:

X3T9.2/92-94           Date: 3/13/92  Author: I. Dal Allan  [5/14/92]
Desc: Information Package on 1988 Connector Decision
 Res:

X3T9.2/92-93           Date: 4/27/92  Author: B. Ham  [5/14/92]
Desc: SCSI-3 Connector Framework
 Res:

X3T9.2/92-92           Date: 4/28/92  Author: J. Lohmeyer  [5/14/92]
Desc: Letter to M. Freeman on Grass Roots
 Res:

X3T9.2/92-91           Date: 4/8/92   Author: J. McGrath  [5/14/92]
Desc: Tolerance Analysis of P-cable Connection
 Res:

X3T9.2/92-90           Date: 4/27/92  Author: F. Crowell  [5/14/92]
Desc: Presentation Foils of Serial DS-Link Technology
 Res:

X3T9.2/92-89           Date: 4/13/92  Author: D. Rundle  [5/14/92]
Desc: Status of IEC 48B Standards Efforts
 Res:

X3T9.2/92-88           Date: 4/23/92  Author: J. Gallant  [5/14/92]
Desc: Two Changes for the CAM document
 Res: Accepted for CAM rev 3.0

X3T9.2/92-87           Date: 4/27/92  Author: D.W. Spence  [5/14/92]
Desc: Key Changes Proposed for the SPI Standard
 Res:

X3T9.2/92-86           Date: 4/27/92  Author: D.W. Spence  [5/14/92]
Desc: SCSI Implementation in a 3.3 volt Environment
 Res:

X3T9.2/92-85           Date: 4/27/92  Author: G. Penokie  [5/14/92]
Desc: CHANGE INQUIRY Command
 Res:

X3T9.2/92-84 Rev 1     Date: 4/24/92  Author: L. Lamers  [5/14/92]
Desc: Preparing Documents for Committee Mailings
 Res:

X3T9.2/92-83           Date: 4/27/92  Author: S. Washburn  [5/14/92]
Desc: Request for Sequential Access Density Codes
 Res: Accepted for SCSI-3

X3T9.2/92-82           Date: 4/7/92   Author: Lynn Barra  [5/14/92]
Desc: Approval of Project Proposal for AT Attachements Extensions
 Res:

X3T9.2/92-81           Date: 4/6/92   Author: Lynn Barra  [5/14/92]
Desc: Transmittal of Public Review Comment #1 ATA
 Res:

X3T9.2/92-80           Date: 4/27/92  Author: F. Crowell  [5/14/92]
Desc: DS-Links Technical Information
 Res:

X3T9.2/92-79 Rev 0     Date: 4/24/92  Author: Charles Monia  [5/14/92]
Desc: SCSI-3 Architecte Model (SAM)
 Res:

X3T9.2/92-78           Date: 4/6/92   Author: M. Freeman  [5/14/92]
Desc: Letter to John Lohmeyer on MAT/MSC P1265
 Res:

X3T9.2/92-77           Date: 4/13/92  Author: John Lohmeyer  [5/14/92]
Desc: Response to M. Freeman of MSC on his 4/6/92 letter
 Res:

X3T9.2/92-76           Date: 3/16/92  Author: G. Penokie  [3/24/92]
Desc: Connector Contact Working Group Meeting Minutes 3/16/92
 Res:

X3T9.2/92-75           Date: 3/18/92  Author: J. Gallant  [3/24/92]
Desc: Creating a TIB for SCSI-2 Tag Queuing working model.
 Res:

X3T9.2/92-74           Date: 3/18/92  Author: S. Shah  [3/24/92]
Desc: Public Review Comment on AT Attachment (BSR X3.221)
 Res:

X3T9.2/92-73           Date: 2/27/92  Author: D. Shoemaker  [3/24/92]
Desc: ltr to Don Laughry re IEE MSC/X3T9 Memory Attach Strategy
 Res:

X3T9.2/92-72           Date: 3/17/92  Author: Lamers/ Spence  [3/24/92]
Desc: SPI Working Group Minutes 3/17/92
 Res:

X3T9.2/92-71           Date: 3/18/92  Author: Lamers/ Lohmeyer  [3/24/92]
Desc: X3T9.2 General Working Group Minutes 3/16-18/92
 Res:

X3T9.2/92-70           Date: 3/16/92  Author: L. Lamers  [3/24/92]
Desc: ATA Extensions Working Group Minutes 3/16/92
 Res:

X3T9.2/92-69           Date: 3/13/92  Author: B. Bellino  [3/24/92]
Desc: Madison Cable Impedance Variations
 Res:

X3T9.2/92-68           Date: 3/16/92  Author: B. Herron  [3/24/92]
Desc: 3M High-Density .050" "D" Ribbon Style Interconnect System
 Res:

X3T9.2/92-67           Date: 1/29/92  Author: J. Best  [3/24/92]
Desc: SSA-PH Appendix Daisy Chain
 Res:

X3T9.2/92-66           Date: 1/28/92  Author:   [3/24/92]
Desc: IBM 9333 SCSI Mapping
 Res:

X3T9.2/92-65           Date: 3/3/92   Author: S. Shah  [3/24/92]
Desc: Support for Greater than 528MB ATA Drive
 Res:

X3T9.2/92-64           Date: 12/18/91 Author: Hanan & Abrahamsson  [3/24/92]
Desc: PCMCIA IDE Drive Auto Select Proposal
 Res:

X3T9.2/92-63           Date: 3/13/92  Author: J. Blagaila  [3/24/92]
Desc: Integral Peripherals 68 Pin IDE Pinout
 Res:

X3T9.2/92-62           Date: 3/17/92  Author: K. Chan  [3/24/92]
Desc: Differential Fast Synchronous Timing
 Res: Presented at 3/92 SPI WG Meeting

X3T9.2/92-61           Date: 3/16/92  Author: T. Asami  [3/24/92]
Desc: SCSI ACK Net with Wired-OR Driver
 Res: Presented at 3/92 SPI WG Meeting

X3T9.2/92-60           Date: 3/18/92  Author: J. Lohmeyer  [3/24/92]
Desc: ltr re PCMCIA/ATA Proposal, dated February 24, 1992
 Res:

X3T9.2/92-59           Date: 2/17/92  Author: B. Ham  [3/24/92]
Desc: Electrical Impacts of SCSI Hot Plugging
 Res:

X3T9.2/92-58           Date: 3/13/92  Author: C. Ghest  [3/24/92]
Desc: Statement re US patent of Glitch remover circuit
 Res:

X3T9.2/92-57           Date: 3/16/92  Author: T. Debiec  [3/24/92]
Desc: Proposal for SCSI Cable Performance Specification
 Res:

X3T9.2/92-56           Date: 3/12/92  Author: A. Wilhelm  [3/24/92]
Desc: Proposal to modify Device Type 0 to support Media Interchange
 Res:

X3T9.2/92-55           Date: 1/31/90  Author: T. Newsom  [3/24/92]
Desc: Molex Specification on Mini Ribbon Shell Shielded Connector
 Res:

X3T9.2/92-54           Date:          Author: T. Newsom  [3/24/92]
Desc: AMP Specification on Receptacle Assembly, 60 Position, Champ .050
 Res:

X3T9.2/92-53           Date: 2/18/91  Author: T. Newsom  [3/24/92]
Desc: Burndy Specification on Microshield (tm) Receptacle
 Res:

X3T9.2/92-52           Date: 9/4/90   Author: T. Newsom  [3/24/92]
Desc: IBM Procurement Specification on Mini Ribbon D Shell Connector
 Res:

X3T9.2/92-51           Date: 3/16/92  Author: T. Newsom  [3/24/92]
Desc: Presentation on Alternative Ribbon Connector for SCSI-3
 Res:

X3T9.2/92-50           Date: 3/17/92  Author: B. Spence  [3/24/92]
Desc: 8-bit Drives Within a 16-bit SCSI System
 Res:

X3T9.2/92-49           Date: 3/16/92  Author: C. Mosley  [3/24/92]
Desc: SCSI-3 Connector
 Res:

X3T9.2/92-48           Date: 3/12/92  Author: J. McGrath  [3/24/92]
Desc: Molex Pin Chamfer Proposal
 Res:

X3T9.2/92-47           Date: 3/12/92  Author: E. Gardner  [3/24/92]
Desc: Request for Sequential-Access Density Codes
 Res:

X3T9.2/92-46 Rev 1     Date: 3/20/92  Author: G. Houlder  [3/24/92]
Desc: Request for new Additional Sense Codes
 Res: On Apr '92 WG agenda

X3T9.2/92-45 Rev 1     Date: 4/27/92  Author: C. Monia  [5/14/92]
Desc: Introduction to Packetized SCSI
 Res:

X3T9.2/92-44           Date:          Author: J. Tecco  [3/24/92]
Desc: May 1992 Working Group Announcement
 Res:

X3T9.2/92-43           Date: 2/18/92  Author: Spence/ Lamers  [3/24/92]
Desc: SPI Working Group Minutes 2/18/92
 Res: n.a.

X3T9.2/92-42           Date: 12/30/91 Author: R. Gibson  [3/24/92]
Desc: International Participation Fee
 Res:

X3T9.2/92-41           Date: 2/22/92  Author: Lamers/ Penokie  [3/24/92]
Desc: Austin Queuing Working Group Minutes
 Res: n.a.

X3T9.2/92-40           Date: 2/21/92  Author: Lamers/ Lohmeyer  [3/24/92]
Desc: X3T9.2 Meeting #98 Minutes -- February 17, 1991
 Res: n.a.

X3T9.2/92-39           Date: 2/12/92  Author: A. Crick  [3/24/92]
Desc: Microsoft concerns with the CAM XPT/SIM document
 Res:

X3T9.2/92-38           Date: 2/13/92  Author: F. Oprescu  [3/24/92]
Desc: Proposal for Glitch Immunity Specification
 Res:

X3T9.2/92-37           Date: 2/18/92  Author: B. Ham  [3/24/92]
Desc: Specifications for SPI Transceivers
 Res:

X3T9.2/92-36           Date: 2/18/92  Author: B. Spence  [3/24/92]
Desc: Termination of Reserved Lines
 Res:

X3T9.2/92-35 Rev 2     Date: 4/28/92  Author: G. Penokie  [5/14/92]
Desc: SCSI-3 Alt 1 Connector Requirements
 Res: Accepted for SCSI-3 Parallel Interface

X3T9.2/92-34           Date: 2/14/92  Author: J. McGrath  [3/23/92]
Desc: DMA Meeting at HP-PCG on 1/24/92
 Res: On ATA Extensions agenda for 3/16/92 14:00

X3T9.2/92-33           Date: 2/7/92   Author: S. Smyers  [3/24/92]
Desc: Proposed Requirements for SCSI-3 devices which use P1394 Physical I/F
 Res: To be included in Annex of SBP document

X3T9.2/92-32           Date: 2/11/92  Author: K. Chan  [3/24/92]
Desc: Fast SCSI Timing Problems and Solutions
 Res: Assigned to SPI WG

X3T9.2/92-31           Date: 2/5/92   Author: Smyers, Neer, & Newsom  [3/24/92]
Desc: Alternate P-Cable Connector for SCSI-3
 Res: On General WG Agenda 3/16/92 17:00

X3T9.2/92-30           Date: 1/31/92  Author: L. Lamers  [3/24/92]
Desc: SPP Architectural Meeting January 27-28, 1992
 Res: n.a.

X3T9.2/92-29           Date: 1/18/92  Author: Dal Allan  [1/21/92]
Desc: Translation of IPI-3 Command Queueing to SCSI Language
 Res:

X3T9.2/92-28           Date: 1/14/92  Author: M. Jordan  [1/21/92]
Desc: Fast Single Ended SCSI Terminator Concept -- Active Negation Emulator
 Res:

X3T9.2/92-27           Date: 12/12/91 Author: C. Butterworth  [1/21/92]
Desc: Serial Storage Architecture SSA-1 (Disk Order Level) Ver 1.0
 Res:

X3T9.2/92-26           Date: 12/12/91 Author: C. Butterworth  [1/21/92]
Desc: Serial Storage Architecture SSA-0 (Transport Layer) Ver 1.0
 Res:

X3T9.2/92-25           Date: 11/15/91 Author: I. Judd  [1/21/92]
Desc: A Serial Link for Storage Subsystems (paper)
 Res:

X3T9.2/92-24           Date: 1/15/92  Author: I. Judd  [1/21/92]
Desc: A Serial Link for Storage Subsystems (presentation)
 Res:

X3T9.2/92-23           Date: 1/1/92   Author: M. Mitoma  [1/21/92]
Desc: Serial Storage Architecture
 Res:

X3T9.2/92-22           Date: 1/17/92  Author: Penokie/ Mosley  [1/21/92]
Desc: SPI Connector Contact Working Group Minutes 1/15/92
 Res:

X3T9.2/92-21           Date:          Author: J. Lohmeyer  [1/21/92]
Desc: SPP Working Group Minutes 1/15/92
 Res:

X3T9.2/92-20           Date:          Author: B. Spence  [1/21/92]
Desc: SPI Working Group Minutes 1/14/92
 Res:

X3T9.2/92-19 Rev 1     Date: 1/24/92  Author: Penokie/ Lamers  [1/21/92]
Desc: SCSI-3 Queuing Working Group Minutes 1/13/92
 Res:

X3T9.2/92-18           Date: 1/16/92  Author: L. Lamers  [1/21/92]
Desc: DADI Working Group Minutes 1/13/92
 Res:

X3T9.2/92-17           Date: 1/14/92  Author: F. Samela  [1/21/92]
Desc: Signal Line Increased Current Kicker
 Res:

X3T9.2/92-16           Date: 1/13/92  Author: C. Mosley  [1/21/92]
Desc: SCSI-3 Connector Presentation
 Res:

X3T9.2/92-15           Date: 1/10/92  Author: E. Gardner  [1/21/92]
Desc: The Meaning of Linked Commands in SCSI-3
 Res:

X3T9.2/92-14           Date: 1/10/92  Author: E. Gardner  [1/21/92]
Desc: Previewing Linked Commands in SCSI-3
 Res:

X3T9.2/92-13           Date: 1/14/92  Author: J. Williams  [1/21/92]
Desc: Conflicting Statement on CA and Queue Suspension
 Res:

X3T9.2/92-12           Date: 1/14/92  Author: J. Williams  [1/21/92]
Desc: CA Clearing Commands
 Res:

X3T9.2/92-11           Date: 1/13/92  Author: C. Runowicz  [1/21/92]
Desc: DMA data transfer method as outlined in AT Attachment
 Res:

X3T9.2/92-10           Date: 1/13/92  Author: T. Hanan  [1/21/92]
Desc: PCMCIA IDE Host Interface Implementation Guide
 Res:

X3T9.2/92-9            Date: 1/7/92   Author: L. Lamers  [1/21/92]
Desc: ltr to Mr. Mori responding to his questions in 91-170
 Res:

X3T9.2/92-8            Date: 1/11/92  Author: W. Burr  [1/21/92]
Desc: An Introduction to X3T9 and I/O Interface Standards
 Res:

X3T9.2/92-7 Rev 1      Date: 2/13/92  Author: V. Novak  [3/24/92]
Desc: Proposed SCSI Identifier Symbols
 Res: Accepted for SCSI-3 SPI at 2/92 plenary meeting

X3T9.2/92-6            Date:          Author: K. Jones  [1/21/92]
Desc: Enhancement of Sequential Access Command Set for Medium Changers
 Res:

X3T9.2/92-5            Date: 1/15/92  Author: Lamers/ Lohmeyer  [1/21/92]
Desc: Houston Working Group Minutes
 Res:

X3T9.2/92-4            Date: 1/10/92  Author: B. Spence  [1/21/92]
Desc: Cable Impedance Revisited
 Res:

X3T9.2/92-3            Date: 12/10/91 Author: SC 25/WG 4 Secretariat  [1/21/92]
Desc: Draft Report of 2nd Mtg of WG 4 held in Bremen, Germany 9/30-10/2 1991
 Res:

X3T9.2/92-2            Date: 12/10/91 Author: SC 25/WG 4 Secretariat  [1/21/92]
Desc: Standardization Activities in ISO/IEC JTC 1/SC 25/WG 4
 Res:

X3T9.2/92-1            Date:          Author: J. Lohmeyer  [1/21/92]
Desc: X3T9.2 1991 Annual Report
 Res:

X3T9.2/91-220          Date: 12/16/91 Author: J. Schwandt  [1/21/92]
Desc: ltr to Milligan proposing ISO 8482 not be changed to match EIA/TIA 485
 Res:

X3T9.2/91-219          Date: 11/8/91  Author: J. Goldie  [1/21/92]
Desc: Recommended changes to ISO 8482 to make compatible with EIA/TIA 485
 Res:

X3T9.2/91-218          Date: 12/11/91 Author: Lamers/ Spence  [1/21/92]
Desc: SPI Working Group Minutes 12/10/91
 Res:

X3T9.2/91-217          Date: 12/11/91 Author: Lamers/ Penokie  [1/21/92]
Desc: SCSI-3 Queuing Working Group Minutes 12/10/91
 Res:

X3T9.2/91-216          Date: 12/11/91 Author: Lamers/ Lohmeyer  [1/21/92]
Desc: X3T9.2 Meeting #97 Minutes -- December 9-10, 1991
 Res:

X3T9.2/91-215          Date: 12/9/91  Author: S. Ego  [1/21/92]
Desc: FPT sustained currents
 Res:

X3T9.2/91-214          Date: 12/4/91  Author: F. Oprescu  [1/21/92]
Desc: The Dip
 Res:

X3T9.2/91-213          Date: 12/9/91  Author: R. Allgood  [1/21/92]
Desc: Fast single ended and other recommendations for SCSI-3
 Res:

X3T9.2/91-212          Date: 10/9/91  Author: D. Hagerman  [1/21/92]
Desc: Command Queuing exerts from IPI
 Res:

X3T9.2/91-211          Date: 12/6/91  Author: A. Youngwerth  [1/21/92]
Desc: Freezing of LUN Queues following a SCSI Bus Reset
 Res:

X3T9.2/91-210          Date: 12/6/91  Author: A. Youngwerth  [1/21/92]
Desc: Discussion of SIM handling of CAM Command Timeouts
 Res:

X3T9.2/91-209          Date: 12/8/91  Author: B. Spence  [1/21/92]
Desc: A Modest Proposal
 Res:

X3T9.2/91-208          Date: 12/5/91  Author: E. Gardner  [1/21/92]
Desc: LRC/CRC Negotiation, Commands vs. Messages
 Res:

X3T9.2/91-207          Date: 12/5/91  Author: E. Gardner  [1/21/92]
Desc: Periodic LRC/CRC Proposal
 Res:

X3T9.2/91-206          Date: 12/4/91  Author: J. Lohmeyer  [1/21/92]
Desc: ltr to Gene Milligan re his X3T9 LB cmnt on ATA
 Res: (see 91-181 for Milligan letter)

X3T9.2/91-205          Date: 12/2/91  Author: J. Lohmeyer  [1/21/92]
Desc: ltr to William Burr re his X3T9 LB cmnt on SCSI-2 CAM
 Res: (see 91-169 for Burr letter)

X3T9.2/91-204          Date: 11/22/91 Author: M. Martinez  [1/21/92]
Desc: March '92 Working Group Meeting Announcement
 Res:

X3T9.2/91-203          Date: 10/25/91 Author: D. Allan  [1/21/92]
Desc: ltr to Jean-Paul Emard re sending ANSI X3.170A to ISO
 Res: (see also 91-152 & 91-158)

X3T9.2/91-202          Date: 11/7/91  Author: R. Van Brunt  [1/21/92]
Desc: P1394 (Serial Bus) Physical Layer for Cable Medium
 Res:

X3T9.2/91-201          Date: 11/13/91 Author: Lamers/ Penokie  [1/21/92]
Desc: Albuquerque Queuing Working Group Minutes
 Res:

X3T9.2/91-200          Date: 11/14/91 Author: Lamers/ Lohmeyer  [1/21/92]
Desc: Albuquerque Working Group Minutes
 Res:

X3T9.2/91-199          Date: 11/8/91  Author: G. Stephens  [1/21/92]
Desc: SCSI-3 Packetized Protocol (SPP) Pathing Commands
 Res:

X3T9.2/91-198          Date: 11/13/91 Author: R. Muething  [1/21/92]
Desc: Recommendations for consideration into SCSI-3 Parallel Interface (SPI)
 Res:

X3T9.2/91-197          Date: 11/8/91  Author: J. Goldie  [1/21/92]
Desc: Comparison of Electrical Char. Stnds: EIA/TIA-485.1983 & ISO 8482.1987
 Res:

X3T9.2/91-196          Date: 11/8/91  Author: J. Goldie  [1/21/92]
Desc: Electrical Characteristics Standards (EIA/TIA-485.1983 & ISO 8482.1987)
 Res:

X3T9.2/91-195          Date: 11/12/91 Author: E. Gardner  [1/21/92]
Desc: "What's In a Queue" presentation
 Res:

X3T9.2/91-194          Date: 11/12/91 Author: B. Spence  [1/21/92]
Desc: Driver and Terminator Terminal Characteristics
 Res:

X3T9.2/91-193          Date: 11/1/91  Author: E. Grivna  [1/21/92]
Desc: IPI Command Queuing
 Res: Presented at 11/91 Queuing meeting

X3T9.2/91-192          Date:          Author: P. Wolf  [1/21/92]
Desc: Apple Late 1991 CAM Proposals Summary
 Res:

X3T9.2/91-191          Date: 11/12/91 Author: Wolf/ Smyers  [1/21/92]
Desc: SCSI-2 CAM Changes Proposal
 Res:

X3T9.2/91-190          Date: 11/8/91  Author: S. Smyers  [1/21/92]
Desc: SCSI3 CCS over P1394 (presentation)
 Res:

X3T9.2/91-189 Rev 2    Date: 3/12/92  Author: S. Smyers  [3/24/92]
Desc: SCSI-3 Serial Bus Protocol Proposal
 Res:

X3T9.2/91-188          Date: 11/7/91  Author: F. Oprescu  [1/21/92]
Desc: SCSI Active Deassertion
 Res:

X3T9.2/91-187          Date: 11/4/91  Author: F. Oprescu  [1/21/92]
Desc: Proposal for a Portable Machine SCSI Bus Termination
 Res:

X3T9.2/91-186          Date: 11/1/91  Author: S. Teymouri  [1/21/92]
Desc: Addition of a new Message to SCSI-3 Message Set
 Res:

X3T9.2/91-185          Date: 11/9/91  Author: D. Steele  [1/21/92]
Desc: Voh/Ioh specification for active negation drivers
 Res:

X3T9.2/91-184          Date: 11/5/91  Author: G. Milligan  [11/6/91]
Desc: Additional Comment on ATA Rev 2.6
 Res:

X3T9.2/91-183          Date:          Author: Lamers/ Penokie  [11/6/91]
Desc: SCSI-3 Queuing Working Group Minutes 10/14/91
 Res:

X3T9.2/91-182          Date: 10/14/91 Author: J. Pickitt  [11/6/91]
Desc: 1992-1993 Fees for Participation in X3, JTC1 TAG, and Their Subgroups
 Res: Service Fees to increase to $300/year

X3T9.2/91-181          Date: 10/18/91 Author: R. Fink  [11/6/91]
Desc: Results of X3T9 LB to forward AT Attachment as dpANS
 Res: Waiting for X3T9.2 response to Milligan comment

X3T9.2/91-180          Date: 11/4/91  Author: G. Houlder  [11/6/91]
Desc: Question on Synchronous Transfer Agreement
 Res:

X3T9.2/91-179 Rev 1    Date: 11/4/91  Author: B. Spence  [1/21/92]
Desc: Proposed Specifications for S/E Shielded Cables
 Res:

X3T9.2/91-178          Date: 11/4/91  Author: B. Spence  [11/6/91]
Desc: Proposed Specifications for High-End S/E Terminator
 Res:

X3T9.2/91-177          Date: 11/4/91  Author: B. Spence  [11/6/91]
Desc: Proposed Resistor Values for Low-End S/E Terminator
 Res:

X3T9.2/91-176 Rev 1    Date: 11/28/91 Author: G. Penokie  [1/21/92]
Desc: SCSI Data Phase LRC proposal
 Res:

X3T9.2/91-175          Date: 10/23/91 Author: P. Savage  [11/6/91]
Desc: Houston, 01/92, Meeting Announcement
 Res:

X3T9.2/91-174          Date: 10/15/91 Author: G. Penokie  [11/6/91]
Desc: Proposed Additional Connector to SCSI-3 Physical Interface
 Res:

X3T9.2/91-173          Date: 10/17/91 Author: Lamers/ Lohmeyer  [11/6/91]
Desc: X3T9.2 Meeting #96 Minutes -- October 14-15, 1991
 Res:

X3T9.2/91-172          Date: 9/1/91   Author: M. Teener  [11/6/91]
Desc: High Speed Serial Bus (P1394) Presentation
 Res:

X3T9.2/91-171          Date: 10/14/91 Author: S. Sharp  [11/6/91]
Desc: Memory Card Overview Presentation
 Res:

X3T9.2/91-170          Date: 9/5/91   Author: M. Mori  [11/6/91]
Desc: ltr to Lamers with questions on SCSI-2
 Res: See 92-9

X3T9.2/91-169          Date: 10/18/91 Author: R. Fink  [11/6/91]
Desc: Results of X3T9 LB to forward SCSI-2 CAM as dpANS
 Res: X3T9 returned CAM for revision per X3T9.2 request

X3T9.2/91-168 Rev 2    Date: 10/16/91 Author: B. Spence  [11/6/91]
Desc: Draft Minutes of the 10/10 Irvine Driver/Terminator Conference
 Res:

X3T9.2/91-167          Date: 10/2/91  Author: B. Spence  [11/6/91]
Desc: Agenda for the 10/10 Irvine Driver/Terminator Conference
 Res:

X3T9.2/91-166          Date: 9/27/91  Author: L. Lamers  [11/6/91]
Desc: Report on IEEE NESCOM Meeting 9/25/91
 Res:

X3T9.2/91-165          Date: 10/14/91 Author: J. McGrath  [11/6/91]
Desc: FFS Press Release
 Res:

X3T9.2/91-164          Date: 10/14/91 Author: J. McGrath  [11/6/91]
Desc: X3 Trade Association
 Res:

X3T9.2/91-163          Date: 10/14/91 Author: J. McGrath  [11/6/91]
Desc: Command Queuing Model
 Res:

X3T9.2/91-162          Date: 10/8/91  Author: S. Smyers  [11/6/91]
Desc: Proposed change in time units for Timeout Value field in CAM
 Res:

X3T9.2/91-161          Date: 10/7/91  Author: D. DesRoches  [11/6/91]
Desc: Interpretation of Section 6.5.2 of SCSI-2
 Res: See item 10.1 of Oct '91 Minutes (91-173)

X3T9.2/91-160          Date: 10/10/91 Author: S. Cornaby  [11/6/91]
Desc: SCSI-3 Proposed Queueing Model
 Res: Assigned to Queuing WG

X3T9.2/91-159          Date: 10/10/91 Author: J. Lohmeyer  [11/6/91]
Desc: DIFFSENSE Signal Loading Issue
 Res: Accepted for SCSI-3 Oct '91

X3T9.2/91-158          Date: 9/16/91  Author: B. Somerville  [11/6/91]
Desc: Response to D. Allan request re ESDI (see 91-152)
 Res:

X3T9.2/91-157 Rev 1    Date: 9/23/91  Author: Penokie/ Lohmeyer  [11/6/91]
Desc: SCSI-3 Queuing Working Group Meeting Minutes
 Res: n.a.

X3T9.2/91-156          Date: 9/18/91  Author: Lamers/ Lohmeyer  [11/6/91]
Desc: St. Paul Working Group Minutes
 Res: n.a.

X3T9.2/91-155          Date:          Author: S. Symers  [11/6/91]
Desc: QUEUE NOW FULL Message
 Res: Info presented by Scott at 9/16 Queuing mtg--do not have doc yet

X3T9.2/91-154          Date:          Author: J. McGrath  [11/6/91]
Desc: Command Queuing Implementation Levels
 Res: Info presented by Jim at 9/16 Queuing mtg--do not have doc yet

X3T9.2/91-153          Date: 9/13/91  Author: E. Gardner  [11/6/91]
Desc: Proposed SCSI-3 I/O Process Progress Messages
 Res:

X3T9.2/91-152          Date: 9/6/91   Author: D. Allan  [11/6/91]
Desc: ltr to Somerville requesting ESDI be sent to ISO
 Res: See 91-158 response that request must come from J.P. Emard

X3T9.2/91-151          Date: 9/9/91   Author: B. Spence  [11/6/91]
Desc: Possible S/E Active-Negation Driver Requirements for SCSI-3
 Res: Assigned to 10/10/91 WG meeting

X3T9.2/91-150          Date: 9/9/91   Author: J. Lohmeyer  [9/11/91]
Desc: SDTR and WDTR Clarification
 Res: Accepted for SCSI-3 by Oct '91 plenary

X3T9.2/91-149          Date: 9/10/91  Author: G. Houlder  [9/11/91]
Desc: Extensions for dual port SCSI (again)
 Res:

X3T9.2/91-148          Date: 9/4/91   Author: J. Williams  [9/11/91]
Desc: AEN via Request Sense
 Res: Sep '91 WG didn't like it

X3T9.2/91-147          Date: 9/6/91   Author: J. Lohmeyer  [9/11/91]
Desc: ltr to C. Camp re his August 8, 1991 letter on IEEE DASG
 Res:

X3T9.2/91-146          Date: 8/20/91  Author: F. Podio  [9/11/91]
Desc: Minutes of Workshop on Optical Disk Error Rate Monitoring and Reporting
 Res:

X3T9.2/91-145          Date: 8/20/91  Author: F. Podio  [9/11/91]
Desc: Meeting Announcement & Draft Agenda for WG on Optical Disk Error Rates
 Res:

X3T9.2/91-144          Date: 8/30/91  Author: D. Shoemaker  [9/11/91]
Desc: Letter to Camp enclosing X3T9 position paper (91-136R1)
 Res: (see 91-136R1)

X3T9.2/91-143          Date: 8/27/91  Author: S. Kolansky  [9/11/91]
Desc: ltr to G. Houlder re SCSI-3 dual port issues
 Res: See 91-149

X3T9.2/91-142          Date: 8/28/91  Author: D. Shoemaker  [9/11/91]
Desc: ltr to Freeman re his letter (91-138) on Memory Model I/F (now DADI)
 Res: see 91-138

X3T9.2/91-141          Date: 8/30/91  Author: J. Lohmeyer  [9/11/91]
Desc: Minutes of Scanner Working Group Meeting August 21, 1991
 Res:

X3T9.2/91-140 Rev 1    Date: 10/8/91  Author: Abilay et al  [11/6/91]
Desc: Proposed Additions and Modifications to CAM interface
 Res:

X3T9.2/91-139          Date: 8/16/91  Author: G. Battrick  [9/11/91]
Desc: Fax to Tharakan re SCSI-3 Scanner Working Group
 Res:

X3T9.2/91-138          Date: 8/9/91   Author: M. Freeman  [9/11/91]
Desc: ltr to Shoemaker re Memory Model I/F Proj Proposal (now DADI)
 Res: X3T9 to resolve issues (see 91-142)

X3T9.2/91-137          Date: 8/27/91  Author: Lamers/ Lohmeyer  [9/11/91]
Desc: X3T9.2 Meeting #95 Minutes -- August 19-20, 1991
 Res:

X3T9.2/91-136 Rev 1    Date: 8/20/91  Author: D. Shoemaker  [9/11/91]
Desc: X3T9 Position letter of IEEE Disk Attach Project
 Res: Accepted by X3T9 on August 23, 1991

X3T9.2/91-135          Date: 8/23/91  Author: D. Shoemaker  [9/11/91]
Desc: Response to X3T9 LB Negative on forwarding SCSI-1 for reaffirmation
 Res:

X3T9.2/91-134          Date: 8/1/91   Author: T. Motoyama  [9/11/91]
Desc: Scanner Proposal
 Res:

X3T9.2/91-133          Date: 8/15/91  Author: B. Snively  [9/11/91]
Desc: Presentation: Description of SCSI FC-4
 Res:

X3T9.2/91-132          Date: 8/16/91  Author: J. Chen  [9/11/91]
Desc: Changes in ATA Document, Revision 2.5, July 16,1991
 Res: Accepted for ATA Rev 2.6

X3T9.2/91-131          Date:          Author: D. Tolmie  [9/11/91]
Desc: Meeting Announcement -- November Working Group Meetings
 Res:

X3T9.2/91-130 Rev 1    Date: 9/1/91   Author: K. Chan  [9/11/91]
Desc: Active Negation Drivers and Alt-2 Termination
 Res:

X3T9.2/91-129          Date: 8/17/91  Author: D. Allan  [9/11/91]
Desc: Background to Material Submitted
 Res:

X3T9.2/91-128          Date: 8/10/91  Author: D. Allan  [9/11/91]
Desc: Disk Attach Project
 Res:

X3T9.2/91-127          Date: 8/14/91  Author: G. Penokie  [9/11/91]
Desc: Tagged Queuing Implementation Example
 Res:

X3T9.2/91-126 Rev 1    Date: 9/9/91   Author: B. Spence  [9/11/91]
Desc: Comparison of S/E Cable/Terminator Options
 Res: Reviewed at Sep '91 WG -- SSWG to address further

X3T9.2/91-125 Rev 1    Date: 8/9/91   Author: C. Pisciotta  [9/11/91]
Desc: Request for Sequential-Access density code
 Res: Rev 1 accepted for SCSI-2 Aug '91

X3T9.2/91-124          Date: 8/6/91   Author: X3 Secretariat  [9/11/91]
Desc: News Release on SCSI-3 Packetized Protocol Project (881-D)
 Res:

X3T9.2/91-123          Date: 8/5/91   Author: L. Barra  [9/11/91]
Desc: Assignment of Project No. 881-D, SCSI-3 Packetized Protocol
 Res:

X3T9.2/91-122 Rev 1.1  Date: 2/15/92  Author: B. Snively  [3/24/92]
Desc: Fiber Channel SCSI Protocol SCSI FC-4
 Res: (Sun proposal for SCSI-3 project)

X3T9.2/91-121          Date: 8/9/91   Author: B. Raudebaugh  [9/11/91]
Desc: Comments on X3T9.2/91-72 (Medium Changer Devices)
 Res: Raudebaugh, Therrien, & Galloway to address issues

X3T9.2/91-120          Date: 8/5/91   Author: L. Barra  [9/11/91]
Desc: X3 approval of new Project 881-D, SCSI-3 Packetized Protocol
 Res: FYI

X3T9.2/91-119          Date: 8/5/91   Author: J. McGrath  [9/11/91]
Desc: Caching codes missing from ATA Rev 2.5
 Res:

X3T9.2/91-118          Date: 7/25/91  Author: G. Hahn  [9/11/91]
Desc: Dealing with multi-initiator issues
 Res: See 91-150

X3T9.2/91-117          Date: 7/3/91   Author: K. McMillan  [9/11/91]
Desc: ANSI Style Manual for Preparation of Proposed ANS (eighth edition)
 Res: FYI

X3T9.2/91-116          Date: 7/9/91   Author: X3 Secretariat  [9/11/91]
Desc: News Release on SCSI-3 Parallel Interface Project (855-D)
 Res: FYI

X3T9.2/91-115          Date: 7/11/91  Author: L. Barra  [9/11/91]
Desc: Notification of Approval of Standard (ESDI)
 Res: At last!

X3T9.2/91-114          Date: 7/18/91  Author: D. Shoemaker  [9/11/91]
Desc: Response to P. Borrill (IEEE) re "Disk Attach Interface" project
 Res: On X3T9 August '91 Agenda

X3T9.2/91-113          Date: 7/8/91   Author: X3 Secretariat  [7/22/91]
Desc: News Release on SCSI-3 Interlocked Protocol Project (856-D)
 Res: FYI

X3T9.2/91-112          Date: 7/2/91   Author: X3 Secretariat  [7/22/91]
Desc: News Release on SCSI-3 Command Set Project (854-D)
 Res: FYI

X3T9.2/91-111          Date: 7/8/91   Author: P. Fessler  [7/22/91]
Desc: Fault Isolation Information Study Group (FIISG)
 Res: FYI

X3T9.2/91-110          Date: 7/19/91  Author: Lamers/ Lohmeyer  [7/22/91]
Desc: Valley Forge Working Group Minutes
 Res: n.a.

X3T9.2/91-109 Rev 1    Date: 8/23/91  Author: D. Allan  [11/6/91]
Desc: Project Proposal for Flat File Command Set
 Res: Sept '91 WG recommended more study

X3T9.2/91-108 Rev 1    Date: 8/23/91  Author: D. Allan  [9/11/91]
Desc: Project Proposal for Directly-Addressable Device Interface (DADI)
 Res: Forwarded to X3T9 Aug '91

X3T9.2/91-107          Date: 7/16/91  Author: J. Lohmeyer  [7/22/91]
Desc: Error in Implementors Note 1) in section 6.9 of SCSI-2 Rev 10e
 Res: Solution #1 accepted for SCSI-2 Aug '91

X3T9.2/91-106 Rev 4    Date: 11/4/91  Author: D. Pickford  [1/21/92]
Desc: Format Status Log Page
 Res: Reflects changes accepted for SCSI-3 at 10/91 meeting

X3T9.2/91-105          Date: 7/13/91  Author: E. Gardner  [7/22/91]
Desc: Multi-Initiator, Enhanced Availability System Environments in SCSI-3
 Res: Ed will write "strawman" proposal

X3T9.2/91-104 Rev 1    Date: 8/23/91  Author: D. Allan  [7/22/91]
Desc: Project Proposal for ATA Extensions
 Res: Forwarded to X3T9 Aug '91

X3T9.2/91-103          Date: 7/11/91  Author: G. Stephens  [7/22/91]
Desc: SCSI-2 91-043 R0 Written Response
 Res: Documents previous verbal response

X3T9.2/91-102 Rev 1    Date: 7/17/91  Author: D. Hagerman  [7/22/91]
Desc: Request for Two Tape Media Identifiers
 Res: Accepted for SCSI-2 Aug '91

X3T9.2/91-101          Date:          Author: R. Richens  [7/22/91]
Desc: Proposed Common Configuration Method for ATA
 Res: alt solution added to ATA R2.5

X3T9.2/91-100          Date:          Author: R. Cummings  [7/22/91]
Desc: Meeting Announcement - Sept '91 X3T9 Working Group Meetings
 Res: n.a.

X3T9.2/91-99           Date: 6/18/91  Author: G. Stephens  [7/22/91]
Desc: Fabric Loop Meeting, June 18, 1991
 Res: n.a.

X3T9.2/91-98 Rev 7     Date: 4/11/92  Author: G. Penokie  [5/14/92]
Desc: SCSI-3 Queuing Model
 Res:

X3T9.2/91-97           Date: 6/27/91  Author: B. Huntsman  [7/22/91]
Desc: Minor Problems with CAM
 Res: Resolved in CAM R2.5

X3T9.2/91-96           Date: 6/27/91  Author: B. Huntsman  [7/22/91]
Desc: Clarifying Relationship of XPT to SIM
 Res: Resolved in CAM R2.5

X3T9.2/91-95           Date: 6/27/91  Author: B. Huntsman  [7/22/91]
Desc: Removing Assumptions about Target Devices
 Res: Rejected

X3T9.2/91-94           Date: 6/27/91  Author: B. Huntsman  [7/22/91]
Desc: Adding a Conformance Clause to CAM
 Res: Resolved in CAM R2.5

X3T9.2/91-93           Date: 6/21/91  Author: K. Chan  [7/22/91]
Desc: Analysis of Nonlinear SCSI Bus Termination
 Res:

X3T9.2/91-92           Date: 6/20/91  Author: K. Jochim  [7/22/91]
Desc: ltr to Dal Allan re PrairieTek patent 4933785
 Res: (see also 91-77)

X3T9.2/91-91 Rev 2     Date: 6/22/91  Author: Lamers/ Lohmeyer  [7/22/91]
Desc: X3T9.2 Meeting #94 Minutes -- June 17-18, 1991
 Res: n.a.

X3T9.2/91-90           Date: 6/20/91  Author: P. Boulay  [7/22/91]
Desc: Media Scan Command, SCSI-2, Chapter 15
 Res: Accepted for SCSI-2 Aug '91

X3T9.2/91-89           Date:          Author: M. Lazar  [7/22/91]
Desc: Industry Standardization of 60 & 68 Position Ribbon Contact Connectors
 Res: Rejected at the June '91 Plenary meeting

X3T9.2/91-88           Date: 6/13/91  Author: A. Wilhelm  [7/22/91]
Desc: Proposal to modify Device Type 0 to support Media Interchange
 Res: Sep '91 WG recommended several changes to remove OS dependencies

X3T9.2/91-87           Date: 5/15/91  Author: F. Podio  [7/22/91]
Desc: Workshop on error rates and error distributions in optical disks
 Res:

X3T9.2/91-86           Date: 6/14/91  Author: G. Milligan  [7/22/91]
Desc: ltr to Fred Lucas, Chair TR30.2, re International Version of RS-485
 Res:

X3T9.2/91-85           Date: 6/14/91  Author: B. Huntsman  [7/22/91]
Desc: Request that SCSI-2 CAM Document not be forwarded yet.
 Res:

X3T9.2/91-84 Rev 1     Date: 6/20/91  Author: D. Shoemaker  [7/22/91]
Desc: Draft response to X3 negative on SCSI-3 Packetized Protocol Project
 Res: See 91-80

X3T9.2/91-83           Date: 5/8/91   Author: L. Barra  [7/22/91]
Desc: X3 approval of Pre-Publication withdrawl of X3.131-1990, SCSI-2
 Res:

X3T9.2/91-82           Date: 5/8/91   Author: L. Barra  [7/22/91]
Desc: X3 approval of new Project 856-D, SCSI-3 Interlocked Protocol
 Res:

X3T9.2/91-81           Date: 5/8/91   Author: L. Barra  [7/22/91]
Desc: X3 approval of new Project 855-D, SCSI-3 Parallel Interface
 Res:

X3T9.2/91-80           Date: 5/8/91   Author: L. Barra  [7/22/91]
Desc: X3 reconsideration of new Project ???-D, SCSI-3 Packetized Protocol
 Res: One negative ballot to address--see 91-84

X3T9.2/91-79           Date: 5/8/91   Author: L. Barra  [7/22/91]
Desc: X3 approval of new Project 854-D, SCSI-3 Command Set
 Res:

X3T9.2/91-78           Date: 5/8/91   Author: L. Barra  [7/22/91]
Desc: X3 approval of deletion of Project 685-D, SCSI-3
 Res:

X3T9.2/91-77           Date: 6/11/91  Author: D. Allan  [7/22/91]
Desc: ltr to Ken Jochim (PRAIRIETEK) re Patent Number 4933785, Claim 45
 Res: (see 91-92)

X3T9.2/91-76           Date: 5/13/91  Author: P. Dougherty  [7/22/91]
Desc: LUNTAR, LUNTRN Bits, and Target Routine Functions
 Res: Peter to revise for SCSI-3

X3T9.2/91-75           Date: 5/28/91  Author: P. Manley  [7/22/91]
Desc: Proposal to support removable media drives on ATA Interface
 Res:

X3T9.2/91-74           Date: 6/5/91   Author: D. Allan  [7/22/91]
Desc: Draft Project Proposal for SCSI Diagnostic Command Set
 Res: Rejected at Aug '91 meeting

X3T9.2/91-73           Date: 5/18/91  Author: D. Allan  [7/22/91]
Desc: SCSI Bus Type Identification
 Res: Also see 91-49 & 91-63

X3T9.2/91-72           Date: 5/23/91  Author: D. Therrien  [7/22/91]
Desc: Additional Medium Changer features to improve interoperation
 Res: (see also 91-121)

X3T9.2/91-71 Rev 1     Date: 6/18/91  Author: G. Penokie  [7/22/91]
Desc: Direct-access removable media ASCQs (another Penokie request)
 Res: Accepted for SCSI-3 at June '91 meeting

X3T9.2/91-70           Date: 5/16/91  Author: Lohmeyer  [7/22/91]
Desc: Harrisburg Working Group Minutes
 Res:

X3T9.2/91-69           Date: 5/13/91  Author: B. Snively  [7/22/91]
Desc: Conformance of SPP and Fiber Channel
 Res:

X3T9.2/91-68           Date: 5/13/91  Author: A. Wilhelm  [7/22/91]
Desc: Proposal for addition of two new Medium Types to Table 8-45
 Res:

X3T9.2/91-67           Date: 5/2/91   Author: A. Wilhelm  [7/22/91]
Desc: Request for new SCSI Peripheral Device Type "Floptical"
 Res:

X3T9.2/91-66           Date: 5/8/91   Author: J. McGrath  [7/22/91]
Desc: Using a PCMCIA Interface on 1.8" Winchester Disk Drives
 Res:

X3T9.2/91-65           Date: 4/22/91  Author: J. McGrath  [7/22/91]
Desc: Tagged Queuing Restrictions
 Res:

X3T9.2/91-64 Rev 3     Date: 1/13/92  Author: D. Steele  [1/21/92]
Desc: Fast Single-Ended and other Recommended Changes to SCSI-3 Parallel I/F
 Res:

X3T9.2/91-63           Date: 5/8/91   Author: B. Medlinski  [5/6/91]
Desc: SCSI Identifier Symbols
 Res:

X3T9.2/91-62           Date: 5/3/91   Author: T. Wicklund  [5/6/91]
Desc: Outbound disconnect and Disconnect Time Limit
 Res:

X3T9.2/91-61           Date: 5/6/91   Author: M. Lazar  [5/6/91]
Desc: Proposal to add 60/68-pin ribbon-contact style connector to standard
 Res:

X3T9.2/91-60           Date: 4/24/91  Author: E. Luttig  [5/6/91]
Desc: Recommended change to SCSI-2
 Res:

X3T9.2/91-59           Date: 4/25/91  Author: J. Lohmeyer  [5/6/91]
Desc: SCSI-3 Scanner Working Group Meeting Minutes -- April 24, 1991
 Res: n.a.

X3T9.2/91-58 Rev 1     Date: 4/25/91  Author: Lamers/ Lohmeyer  [5/6/91]
Desc: X3T9.2 Meeting #93 Minutes -- April 22-23, 1991
 Res: n.a.

X3T9.2/91-57 Rev 1     Date:          Author: D. Morrissey  [5/6/91]
Desc: Meeting Announcement - July '91 X3T9 Working Group Meetings
 Res: n.a.

X3T9.2/91-56           Date: 4/22/91  Author: J. McGrath  [5/6/91]
Desc: New SCSI Commands for FFS (Flat File System)
 Res: Assigned to May '91 SCSI WG

X3T9.2/91-55           Date: 3/21/91  Author: Anon  [5/6/91]
Desc: Draft Detailed Charter for the IEEE Disk Attach Working Group
 Res: n.a.

X3T9.2/91-54           Date: 4/4/91   Author: B. Johnson  [5/6/91]
Desc: Low-cost Serial Interface Presentation giving 4/23/91
 Res: Assigned to May '91 SCSI WG

X3T9.2/91-53           Date: 4/19/91  Author: D. Hagerman  [5/6/91]
Desc: Various SCSI Interpretation Questions
 Res: Assigned to May '91 SCSI WG

X3T9.2/91-52 Rev 1     Date: 5/14/91  Author: J. McGrath  [7/22/91]
Desc: Cable Select Feature
 Res: Assigned to May '91 SCSI WG

X3T9.2/91-51           Date: 4/21/91  Author: B. Galloway  [5/6/91]
Desc: MODE SELECT Error Detection
 Res: See Apr '91 minutes (91-58) item 9.4

X3T9.2/91-50           Date: 4/18/91  Author: R. Prichard  [5/6/91]
Desc: Fax re IT8/WG14 Scanner Activities
 Res: Assigned to Apr '91 Scanner WG

X3T9.2/91-49 Rev 1     Date: 4/25/91  Author: J. Lohmeyer  [5/6/91]
Desc: SCSI Bus Type Identification
 Res: Assigned to May '91 SCSI WG

X3T9.2/91-48 Rev 1     Date: 4/17/91  Author: G. Milligan  [5/6/91]
Desc: Suggested Minimum DCS Model
 Res: Assigned to May '91 SCSI WG

X3T9.2/91-47           Date: 4/17/91  Author: G. Milligan  [5/6/91]
Desc: DC Power Connector for Personal Computer Peripherals
 Res: Completes Gene's 2/91 Action Item

X3T9.2/91-46 Rev 1     Date: 4/16/91  Author: J. Gallant  [7/22/91]
Desc: Proposed Changes and Additions for Common Access Method
 Res: Assigned to May '91 SCSI WG

X3T9.2/91-45           Date: 4/16/91  Author: C. Pisciotta  [5/6/91]
Desc: Sequential Access Density Code Correction
 Res: Accepted for SCSI-2 at Apr '91 meeting

X3T9.2/91-44           Date:          Author: G. Stephens  [9/11/91]
Desc: Commands to support Multi-pathing in SCSI-3
 Res:

X3T9.2/91-43           Date: 3/20/91  Author: D. Moore  [5/6/91]
Desc: Questions about SCSI-2 Sequential-Access Devices
 Res: also see 91-45

X3T9.2/91-42           Date: 3/22/91  Author: J. Lohmeyer  [5/6/91]
Desc: Data Compression Working Group Meeting 3/18/91
 Res: n.a.

X3T9.2/91-41           Date: 3/21/91  Author: Lamers/ Lohmeyer  [5/6/91]
Desc: Sunnyvale Working Group Minutes
 Res: n.a.

X3T9.2/91-40           Date: 3/15/91  Author: D. Hagerman  [5/6/91]
Desc: Request for Interpretation of SCSI-2 on the use of MODE SENSE data
 Res: Doc not formally submitted--see 91-41 item 19

X3T9.2/91-39 Rev 1     Date: 4/3/91   Author: P. Boulay  [5/6/91]
Desc: Media Changer Device Capabilities Page
 Res: Alternative 2A recommended by 3/91 WG for SCSI-2

X3T9.2/91-38           Date: 8/3/90   Author: T. Le  [5/6/91]
Desc: FPT - Forced Perfect Termination (Foils)
 Res: Presented at Mar '91 WG Meeting

X3T9.2/91-37           Date: 8/3/90   Author: T. Le  [5/6/91]
Desc: FPT - Forced Perfect Termination
 Res:

X3T9.2/91-36           Date: 3/18/91  Author: B. Galloway  [5/6/91]
Desc: SCSI-2 Medium Changer Devices field descriptions
 Res: Recommended by 3/91 WG for SCSI-2

X3T9.2/91-35           Date: 3/18/91  Author: B. Galloway  [5/6/91]
Desc: Clean up of 5.6.13 MESSAGE PARITY ERROR
 Res: Recommended by 3/91 WG for SCSI-2 with minor changes

X3T9.2/91-34 Rev 1     Date: 3/22/91  Author: G. Penokie  [5/6/91]
Desc: Response to X3T9.2/90-173 Document
 Res: Summarizes SCSI-2 R10d changes re concurrent I/O Processes

X3T9.2/91-33           Date: 3/11/91  Author: G. Villapiano  [3/7/91]
Desc: Agenda items for April 24 Scanner Working Group Meeting
 Res:

X3T9.2/91-32           Date: 3/12/91  Author: G. Houlder  [3/7/91]
Desc: Response to ATN during RESELECTION
 Res:

X3T9.2/91-31           Date: 3/18/91  Author: B. Spence  [3/7/91]
Desc: Cable Issues
 Res:

X3T9.2/91-30           Date: 3/11/91  Author: B. Spence  [3/7/91]
Desc: Cabling Article Submission
 Res:

X3T9.2/91-29           Date: 3/7/91   Author: G. Tharakan  [3/7/91]
Desc: SCSI-3 CCS for scanner devices
 Res:

X3T9.2/91-28           Date: 3/4/91   Author: J. Lohmeyer  [3/7/91]
Desc: ltr re the Scanner Working Group Meeting -- April 24, 1991
 Res:

X3T9.2/91-27 Rev 1     Date: 3/22/91  Author: G. Penokie  [5/6/91]
Desc: New Additional Sense Code (5Dh)
 Res: Accepted for SCSI-3 at 4/91 meeting

X3T9.2/91-26           Date: 2/21/91  Author: Lamers/ Lohmeyer  [3/7/91]
Desc: X3T9.2 Meeting #92 Minutes -- February 18-19, 1991
 Res: n.a.

X3T9.2/91-25           Date: 2/18/91  Author: Chan/ Lohmeyer/ Penokie  [3/7/91]
Desc: SCSI-3 Architecture
 Res: Presented at Feb '91 meeting

X3T9.2/91-24           Date: 2/18/91  Author: J. McGrath  [3/7/91]
Desc: Requirements for Implementing Tagged Command Queuing
 Res: Assigned to Mar '91 WG

X3T9.2/91-23           Date: 2/19/91  Author: J. McGrath  [3/7/91]
Desc: Foils re ESDI Power Pin issue presented 2/19/91
 Res: (See also 90-199)  Gene Milligan to draft letter to IEC

X3T9.2/91-22           Date: 2/18/91  Author: J. McGrath  [3/7/91]
Desc: Requirements for a Diagnostic Command Set
 Res: Assigned to Mar '91 WG

X3T9.2/91-21           Date: 2/1/91   Author: G. Murdock  [3/7/91]
Desc: SCSI-2 Additions to Reconcile ISO 8482 and RS-485 Electrical Specs.
 Res: Feb '91 voted to reference RS-485 in SCSI-2

X3T9.2/91-20           Date: 2/15/91  Author: G. Murdock  [3/7/91]
Desc: Low-Power Differential Test Setup and Results
 Res: Presented at Feb '91 meeting

X3T9.2/91-19           Date: 2/15/91  Author: P. Hanmann  [3/7/91]
Desc: Using MODE SELECT to reset a drive to defaults
 Res: Assigned to Mar '91 WG

X3T9.2/91-18           Date: 2/18/91  Author: B. Spence  [3/7/91]
Desc: Glitch Report--Silicon and Stub
 Res: Presented at Feb '91 meeting

X3T9.2/91-17           Date: 2/12/91  Author: K. Gonda  [3/7/91]
Desc: Ltr from Kris Gonda (ANSI) to Larry Lamers Re: SCSI-2 Editing
 Res: n.a.

X3T9.2/91-16           Date: 1/28/91  Author: C. Brill  [3/7/91]
Desc: Working Group Week Meeting Notice: Harrisburg May 13-17, 1991
 Res: n.a.

X3T9.2/91-15           Date: 2/1/91   Author: J. Gallant  [3/7/91]
Desc: Changes for the Latest CAM document
 Res: Partially included in Rev 2.3

X3T9.2/91-14 Rev 6     Date: 7/18/91  Author: G. Penokie  [7/22/91]
Desc: Control of SCSI Device Power Consumption
 Res: Accepted for SCSI-3 at Aug '91 meeting

X3T9.2/91-13 Rev 2     Date: 3/27/92  Author: G. Stephens  [3/24/92]
Desc: draft working document SCSI-3 Generic Packetized Protocol (GPP)
 Res:

X3T9.2/91-12           Date:          Author:   []
Desc: draft working document SCSI-3 Command Set (SCS)
 Res:

X3T9.2/91-11 Rev 1     Date: 3/14/92  Author: K. Chan  [3/24/92]
Desc: draft working document SCSI-3 Interlocked Protocol (SIP)
 Res:

X3T9.2/91-10 Rev 3     Date: 3/17/92  Author: K. Chan  [3/24/92]
Desc: draft working document SCSI-3 Parallel Interface (SPI)
 Res:

X3T9.2/91-9            Date: 2/7/91   Author: J. Lohmeyer  [3/7/91]
Desc: X3T9.2 Annual Report for 1990
 Res: n.a.

X3T9.2/91-8 Rev 1      Date: 2/18/91  Author: G. Stephens  [3/7/91]
Desc: SCSI-2 Message System Cleanup
 Res: 2nd half accepted for SCSI-2 Feb '91 (1st half assigned to WG)

X3T9.2/91-7            Date: 1/22/91  Author: Lamers/ Lohmeyer  [3/7/91]
Desc: Low-Power Differential Working Group Minutes January 14, 1991
 Res: n.a.

X3T9.2/91-6 Rev 1      Date: 2/18/91  Author: M. Peper  [3/7/91]
Desc: How does one change the Active Notch field in the Notch Mode page?
 Res: Feb '91 plenary accepted for SCSI-2

X3T9.2/91-5            Date: 1/15/91  Author: S. Anderson  [3/7/91]
Desc: Addition to Set Features command
 Res: Accepted for ATA Rev 2.3

X3T9.2/91-4            Date: 1/16/91  Author: Lamers/ Lohmeyer  [3/7/91]
Desc: Costa Mesa Working Group Minutes
 Res: n.a.

X3T9.2/91-3            Date: 1/14/91  Author: M. Teener  [3/7/91]
Desc: P1394 High Speed Serial Bus -- A Technical Summary
 Res: Presented at the January '91 WG Meeting

X3T9.2/91-2 Rev 1      Date: 2/15/91  Author: K. Chan  [3/7/91]
Desc: Analysis of long single-ended buses
 Res:

X3T9.2/91-1 Rev 1      Date: 1/15/91  Author: J. Lohmeyer  [3/7/91]
Desc: SCSI-3 Wide Bus Driving Rules Selection and Reselection Phases
 Res: Feb '91 plenary accepted for SCSI-3

X3T9.2/90-203          Date: 1/4/91   Author: D. Shaff  [1/3/91]
Desc: Request for Technical Presentation on PCMCIA
 Res: Presentation given Feb '91

X3T9.2/90-202          Date: 12/3/90  Author: P. Boulay  [1/3/91]
Desc: Location of LBA Zero on Audio CD Media
 Res: A clarification for SCSI-2 was accepted at the Feb '91 meeting

X3T9.2/90-201 Rev 1    Date: 1/23/91  Author: G. Penokie  [3/7/91]
Desc: Non-ASCII Characters in Log List Parameters
 Res: Feb '91 meeting accepted for SCSI-3

X3T9.2/90-200          Date: 1/2/91   Author: R. Simpson  [1/3/91]
Desc: CD-ROM Logical Block Address Clarification
 Res: A clarification for SCSI-2 was accepted at the Feb '91 meeting

X3T9.2/90-199          Date: 12/10/91 Author: J. McGrath  [1/3/91]
Desc: ESDI Power Pin Diameter Issue
 Res: Milligan/McGrath to write letter to IEC (Feb '91)

X3T9.2/90-198          Date: 12/3/90  Author: S. Krupa  [1/3/91]
Desc: HP Data Compression Presentation (Dec 3, 1990)
 Res:

X3T9.2/90-197          Date:          Author: D. Allan  [1/3/91]
Desc: March 1991 Working Group Meeting Announcement
 Res:

X3T9.2/90-196          Date: 11/15/90 Author: L. Perkins  [1/3/91]
Desc: Feasibility of Totem Pole Termination for Low Power Differential SCSI
 Res:

X3T9.2/90-195          Date:          Author: G. Murdock  [1/3/91]
Desc: Foils presented at Dec '90 meeting re Low Power Differential
 Res:

X3T9.2/90-194          Date: 9/20/90  Author: R. Cummings  [1/3/91]
Desc: Fiber Channel: The Next Standard Peripheral Interface
 Res: Presented at Dec '90 plenary meeting

X3T9.2/90-193          Date: 12/7/90  Author: Lamers/ Lohmeyer  [1/3/91]
Desc: X3T9.2 Meeting #91 Minutes -- December 3-4, 1990
 Res: n.a.

X3T9.2/90-192          Date: 12/5/90  Author: L. Lamers  [1/3/91]
Desc: FAX to Kristine Gonda re SCSI-2 withdrawal
 Res: Advises ANSI of X3T9.2 recommendation

X3T9.2/90-191          Date:          Author: G. Stephens  [1/3/91]
Desc: Fiber Channel for SCSI
 Res: Presented at Dec '90 plenary meeting

X3T9.2/90-190          Date: 11/30/90 Author: S. Anderson  [1/3/91]
Desc: Request changes to the ATA specification
 Res: Mostly rejected by the ATA WG meeting 12/3/90

X3T9.2/90-189          Date: 12/4/90  Author: I. Judd  [1/3/91]
Desc: A serial Link for Storage Sub-Systems
 Res: Presented at Dec '90 plenary meeting

X3T9.2/90-188 Rev 1    Date: 11/29/90 Author: L. Lamers  [1/3/91]
Desc: Report on ANSI Editing Session November 27-28, 1990
 Res: X3T9.2 has recommended withdrawing SCSI-2 from ANSI

X3T9.2/90-187          Date: 11/28/90 Author: K. Chan  [1/3/91]
Desc: HP Standoffs on P Cables
 Res: Jack screws accepted for SCSI-3 68-pos. conn. at Feb '91 meeting

X3T9.2/90-186 Rev 2.7  Date: 3/15/92  Author: D. Allan  [3/24/92]
Desc: SCSI-2 Common Access Method Transport and SCSI Interface Module
 Res:

X3T9.2/90-185 Rev 1    Date: 12/19/90 Author: B. Spence  [1/3/91]
Desc: S/E Impedance Optimization and Best Case Analysis II
 Res:

X3T9.2/90-184          Date: 11/16/90 Author: G. Penokie  [1/3/91]
Desc: New Additional Sense Code Qualifiers
 Res: Accepted for SCSI-3 at the Feb '91 meeting

X3T9.2/90-183          Date: 11/15/90 Author: G. Penokie  [1/3/91]
Desc: Increasing LUN Addressability
 Res: Accepted for SCSI-3 at the Feb '91 meeting

X3T9.2/90-182          Date: 11/5/90  Author: D. Lincer  [1/3/91]
Desc: RESERVED Lines Proposal and Impact
 Res: Should be re-addressed in SCSI-3 Parallel Interface project

X3T9.2/90-181 Rev 1    Date: 12/12/90 Author: G. Penokie  [3/7/91]
Desc: Overlapped Commands on AT bus
 Res: Accepted for ATA at Dec '90 WG meeting

X3T9.2/90-180          Date: 10/25/90 Author: J-P. Emard  [11/5/90]
Desc: New Procedures for the Approval of Editorial Changes and Errata
 Res: X3 is changing the rules again, midstream.

X3T9.2/90-179          Date: 10/25/90 Author: J. Flanagan  [11/5/90]
Desc: X3 LB on approving ESDI (X3.170-1990) Editorial Changes
 Res: X3LB closes 11/29/90

X3T9.2/90-178          Date: 10/18/90 Author: R. Dimmick  [11/5/90]
Desc: SCSI Hot Plugging Requirements
 Res:

X3T9.2/90-177          Date: 10/31/90 Author: G. Murdock  [11/5/90]
Desc: SCSI-3 Cable Pin Outs
 Res:

X3T9.2/90-176          Date: 11/1/90  Author: Jessen/ Lamers/ Lohmeyer
[11/5/90]
Desc: Austin Low-Power Differential Working Group Minutes
 Res:
X3T9.2/90-175          Date: 11/1/90  Author: L. Lamers  [11/5/90]
Desc: Austin Cable Working Group Minutes
 Res:

X3T9.2/90-174          Date: 11/1/90  Author: Lamers/ Lohmeyer  [11/5/90]
Desc: Austin Working Group Minutes
 Res:

X3T9.2/90-173          Date: 10/30/90 Author: M. Peper  [11/5/90]
Desc: Multiple I/O Processes in SCSI
 Res: (See 91-34)

X3T9.2/90-172 Rev 1    Date: 12/7/90  Author: J. Lohmeyer  [1/3/91]
Desc: Project Proposal for SCSI-3 Command Set
 Res: Forwarded to X3T9

X3T9.2/90-171 Rev 1    Date: 12/7/90  Author: J. Lohmeyer  [1/3/91]
Desc: Project Proposal for SCSI-3 Interlocked Protocol
 Res: Forwarded to X3T9

X3T9.2/90-170 Rev 1    Date: 12/19/90 Author: B. Spence  [1/3/91]
Desc: S/E Cable Test Report No. 4
 Res:

X3T9.2/90-169          Date: 11/5/90  Author: G. Penokie  [11/5/90]
Desc: SCSI-2 Rules for Multiple Active I/O Processes
 Res:

X3T9.2/90-168 Rev 2    Date: 3/8/91   Author: G. Milligan  [3/7/91]
Desc: SCSI Function to allow User Friendly Long Busy
 Res: Accepted for SCSI-3 at the Feb '91 meeting

X3T9.2/90-167 Rev 1    Date: 11/2/90  Author: B. Spence  [11/5/90]
Desc: S/E Reliability Enhancements
 Res:

X3T9.2/90-166 Rev 1    Date: 10/30/90 Author: G. Milligan  [11/5/90]
Desc: Initiator Support of Modify Data Pointers Message
 Res: Accepted for SCSI-3 at Dec '90 meeting

X3T9.2/90-165          Date: 10/18/90 Author: Penokie/ Lohmeyer  [11/5/90]
Desc: SCSI Information Bulletin #1
 Res: Forwarded by X3T9 to X3

X3T9.2/90-164          Date: 10/18/90 Author: D. Shoemaker  [11/5/90]
Desc: Draft Response to G. Penokie re: SCSI-2 Request for Interpretation #3
 Res: (Cover letter for 90-165R0)

X3T9.2/90-163          Date: 10/17/90 Author: Lamers/ Lohmeyer  [11/5/90]
Desc: X3T9.2 Meeting #90 Minutes -- October 15-16, 1990
 Res: n.a

X3T9.2/90-162          Date:          Author: G. Penokie  [11/5/90]
Desc: Parity Checking and SELECTION/RESELECTION Rules for 16/32 Bit Devices
 Res:

X3T9.2/90-161          Date: 10/14/90 Author: G. Milligan  [11/5/90]
Desc: Reference Summary of ISO DIS LB Comments on ESDI
 Res:

X3T9.2/90-160          Date: 10/15/90 Author: B. Spence  [11/5/90]
Desc: Pinout Control of SCSI Round Cable Assemblies
 Res: Revised as requirement and accepted for SCSI-3 at 10/90 mtg

X3T9.2/90-159 Rev 1    Date: 10/17/90 Author: K. Chan  [11/5/90]
Desc: REQ/ACK signal quality and Fast Single-ended
 Res:

X3T9.2/90-158          Date: 10/12/90 Author: K. Post  [11/5/90]
Desc: Meeting Announcement -- January Working Groups
 Res: n.a.

X3T9.2/90-157          Date: 10/14/90 Author: B. Spence  [11/5/90]
Desc: S/E Cable Test Report No. 3
 Res:

X3T9.2/90-156          Date: 9/11/90  Author: R. Bellino  [11/5/90]
Desc: IPI/HIPPI/SCSI-2 Color Code
 Res: 10/90 plenary rejected any standard color code

X3T9.2/90-155          Date: 10/1/90  Author: R. Strum  [11/5/90]
Desc: Suggestion for Appendix H.2 of SCSI-2
 Res: ANSI Editor has agreed to include this change

X3T9.2/90-154          Date: 10/2/90  Author: C. Micalizzi  [11/5/90]
Desc: Low Power Differential SCSI Working Group
 Res:

X3T9.2/90-153 Rev 2    Date: 10/19/90 Author: J. Lohmeyer  [11/5/90]
Desc: Draft Project Proposal for SCSI Information Bulletins
 Res: Forwarded by X3T9 to X3

X3T9.2/90-152          Date: 10/3/90  Author: M. Wingard  [11/5/90]
Desc: Cable color code should not be standardized
 Res: 10/90 plenary rejected any standard color code

X3T9.2/90-151          Date: 10/1/90  Author: J. Lohmeyer  [11/5/90]
Desc: Ltr Lohmeyer to Bailey requesting SD-2 Clarification re Termination
 Res:

X3T9.2/90-150          Date: 9/17/90  Author: R. Barth  [11/5/90]
Desc: ISO/IEC voting results on SCSI-2 DP
 Res:

X3T9.2/90-149          Date: 9/10/90  Author: L. Barra  [11/5/90]
Desc: Approval of SCSI CAM project proposal (Project # 792-D)
 Res: n.a.

X3T9.2/90-148          Date: 9/10/90  Author: L. Barra  [11/5/90]
Desc: Approval of AT Attachment project proposal (Project # 791-D)
 Res: n.a.

X3T9.2/90-147          Date: 9/10/90  Author: D. Shoemaker  [11/5/90]
Desc: ltr assigning ESDI vendor ID code 22 as "Magtron"
 Res: n.a.

X3T9.2/90-146 Rev 2    Date: 12/7/90  Author: D. Allan  [1/3/91]
Desc: Project Proposal for SCSI-3 Packetized Protocol
 Res: Forwarded to X3T9

X3T9.2/90-145          Date: 9/11/90  Author: K. Chan  [11/5/90]
Desc: Backward Compatible Threaded Standoff for SCSI-2 High-Density Connector
 Res:

X3T9.2/90-144          Date: 8/31/90  Author: L. Germani  [9/10/90]
Desc: Notification of Approval of SCSI-2 Standard
 Res:

X3T9.2/90-143 Rev 3.0  Date: 11/22/91 Author: D. Allan  [1/21/92]
Desc: AT Attachment draft proposal
 Res: Forwarded to X3 by X3T9 in Oct '91

X3T9.2/90-142          Date: 9/7/90   Author: T. Maezawa  [9/10/90]
Desc: Proposal for Color Coding of SCSI-2 Cables
 Res: 10/90 plenary rejected any standard color code

X3T9.2/90-141          Date: 9/10/90  Author: C. Grant  [9/10/90]
Desc: Color Code for SCSI Cables
 Res: 10/90 plenary rejected any standard color code

X3T9.2/90-140          Date: 9/7/90   Author: L. Lamers  [9/10/90]
Desc: September 5, 1990 Cable Working Group Meeting
 Res: n.a.

X3T9.2/90-139          Date: 9/7/90   Author: Lamers/ Lohmeyer  [9/10/90]
Desc: Westminster Working Group Minutes
 Res: n.a.

X3T9.2/90-138          Date: 8/31/90  Author: D. Wagner  [9/10/90]
Desc: SCSI-3 Color Code
 Res: 10/90 plenary rejected any standard color code

X3T9.2/90-137          Date: 8/29/90  Author: P. Blackford  [9/10/90]
Desc: Proposed SCSI-2 color coding appendix
 Res: 10/90 plenary rejected any standard color code

X3T9.2/90-136 Rev 3    Date: 1/8/91   Author: G. Houlder  [3/7/91]
Desc: Extentions for dual port SCSI
 Res: Rev 2 was accepted for SCSI-3 as modified at Dec '90 meeting

X3T9.2/90-135          Date: 9/4/90   Author: B. Spence  [9/10/90]
Desc: "November" Working Group Announcement
 Res: n.a.

X3T9.2/90-134          Date: 8/24/90  Author: J. Fiala  [9/10/90]
Desc: Rough draft of cable test parameters, procedures, and philosophies
 Res:

X3T9.2/90-133 Rev 1    Date: 9/5/90   Author: J. Lohmeyer  [9/10/90]
Desc: SCSI-3 Modifications to Outbound DISCONNECT Message
 Res: Accepted by Oct '90 plenary

X3T9.2/90-132 Rev 3    Date: 12/3/90  Author: G. Stephens  [1/3/91]
Desc: SCSI-3 Additions for Packetization/Serial Interface
 Res:

X3T9.2/90-131          Date: 8/22/90  Author: Lamers/ Lohmeyer  [9/10/90]
Desc: X3T9.2 Meeting #89 Minutes -- August 20-21, 1990
 Res: Accepted as written

X3T9.2/90-130          Date: 8/16/90  Author: S. Krupa  [9/10/90]
Desc: Comments on 90-116 regarding partition size descriptions
 Res: SCSI-2 RFI #1 resolved at August meeting

X3T9.2/90-129          Date: 8/17/90  Author: E. Young  [9/10/90]
Desc: Postponement of action on Request for Interpretation #1
 Res: SCSI-2 RFI #1 resolved at August meeting

X3T9.2/90-128          Date: 7/17/90  Author: S. Cornaby  [9/10/90]
Desc: Illegal message handshaking
 Res: DId not get much support at Sep '90 WG meeting

X3T9.2/90-127          Date: 8/16/90  Author: K. Chan  [9/10/90]
Desc: 16-bit Connector Retention and 32-bit Physical Layer Thoughts
 Res: Presented at Sept WG meeting

X3T9.2/90-126          Date: 8/17/90  Author: G. Milligan  [9/10/90]
Desc: SCSI-3 Proposal for Messages and Commands Supported Lists
 Res: G. Houlder to draft proposal for MDP control bit

X3T9.2/90-125          Date: 6/30/90  Author: G. Milligan  [9/10/90]
Desc: Additional SCSI Functions Resulting from a CHECK CONDITION
 Res: ARC bit redundant with ECA, DAQ still pending

X3T9.2/90-124          Date: 8/16/90  Author: B. Spence  [9/10/90]
Desc: Single-Ended Cable Test Report Number 2
 Res: Presented at Aug '90 meeting

X3T9.2/90-123 Rev 1    Date: 8/31/90  Author: B. Spence  [9/10/90]
Desc: Single-Ended Cable Best Case Analysis
 Res: Discussed at Sep '90 Cable Spec. Meeting

X3T9.2/90-122          Date: 7/23/90  Author: A. Roccati  [9/10/90]
Desc: Request for non-voting Principal membership in X3T9.2
 Res: Granted for 1991 -- Shoemaker requesting rule change at CBEMA

X3T9.2/90-121          Date: 7/23/90  Author: L. Barra  [9/10/90]
Desc: X3 LB Results on approving SCSI-2 (34-0-0-6)
 Res: Hip, Hip, Hurray!

X3T9.2/90-120 Rev 3    Date: 10/15/90 Author: G. Penokie  [11/5/90]
Desc: Draft response to Request for Interpretation #3 on SCSI-2
 Res: Accepted by Oct '90 plenary as response to RFI#3 (see 90-165)

X3T9.2/90-119 Rev 3    Date: 3/25/91  Author: S. Krupa  [5/6/91]
Desc: Data Compression Mode Page Proposal
 Res: Part 3 accepted for SCSI-3 at 4/91 meeting

X3T9.2/90-118          Date: 7/13/90  Author: P. Boulay  [7/17/90]
Desc: Standards referenced in the SCSI-2 CD-ROM Section
 Res: Accepted for SCSI-2 as editorial clarification

X3T9.2/90-117          Date: 7/12/90  Author: J. Lohmeyer  [7/17/90]
Desc: Draft Response to B. Earle re: SCSI-2 Request for Interpretation #2
 Res: Forwarded to X3T9

X3T9.2/90-116 Rev 1    Date: 8/24/90  Author: J. Lohmeyer  [9/10/90]
Desc: Draft Response to B. Earle re: SCSI-2 Request for Interpretation #1
 Res: X3T9 accepted and sent to X3

X3T9.2/90-115          Date: 7/9/90   Author: L. Lamers  [7/17/90]
Desc: July 9, 1990 Cable Working Group Meeting
 Res: n.a.

X3T9.2/90-114          Date: 7/11/90  Author: Lamers/ Lohmeyer  [7/17/90]
Desc: Rochester Working Group Minutes
 Res: n.a.

X3T9.2/90-113          Date: 7/6/90   Author: B. Shah  [7/17/90]
Desc: Interpretation of Mode Parameters Medium Partition Page (1)
 Res: Response to 90-98 and 90-87

X3T9.2/90-112          Date: 7/6/90   Author: B. Shah  [7/17/90]
Desc: Interpretation of LOCATE and READ POSITION Commands
 Res: Response to 90-97

X3T9.2/90-111 Rev 1    Date: 7/25/90  Author: G. Penokie  [9/10/90]
Desc: Req. for Interpret. (#3) SCSI-2 exception conditions in log operations
 Res: 90-120R3 accepted 10/90 as draft response

X3T9.2/90-110 Rev 2    Date: 7/3/90   Author: G. Penokie  [7/17/90]
Desc: Defect List Lengths exceeding 64 Kbytes
 Res: Accepted for SCSI-3 at 8/90 meeting

X3T9.2/90-109          Date: 6/28/90  Author: G. Stephens  [7/17/90]
Desc: More SCSI Tape Stuff
 Res: See 90-87,-97,-98,-116,&-117

X3T9.2/90-108          Date:          Author: W. Stengel  [7/17/90]
Desc: NCR Contribution to Cable Spec. WG (Cable, Shielded-25 Pr, #28AWG...)
 Res:

X3T9.2/90-107          Date: 7/6/90   Author: K. Chan  [7/17/90]
Desc: High Density Connector Specification Issues
 Res: WG recomends no changes be made to SCSI-2; address in SCSI-3 PHY

X3T9.2/90-106          Date: 7/6/90   Author: K. Chan  [7/17/90]
Desc: Best/Worst Case Cable Crosstalk Comparison
 Res: See 90-115

X3T9.2/90-105 Rev 3    Date: 12/7/90  Author: J. Lohmeyer  [1/3/91]
Desc: Project Proposal for SCSI-3 Parallel Interface
 Res: Forwarded to X3T9

X3T9.2/90-104          Date: 7/5/90   Author: J. Lohmeyer  [7/17/90]
Desc: High-Density Interconnection Working Group Meeting
 Res: n.a.

X3T9.2/90-103 Rev 3    Date: 5/1/91   Author: D. Pickford  [7/22/91]
Desc: Proposed Extensions for SCSI-3, Standard Physical Layer Access
 Res:

X3T9.2/90-102          Date: 3/19/90  Author: J. Flanagan  [7/17/90]
Desc: Ltr appointing chairman of X3T9.2 until April 1, 1993
 Res: n.a.

X3T9.2/90-101          Date:          Author: R. Cummings  [7/17/90]
Desc: Boulder Working Groups Meeting Notice September 4-7
 Res: n.a.

X3T9.2/90-100          Date: 6/26/90  Author: B. Spence  [7/17/90]
Desc: SCSI Cables Observations and Proposals
 Res: See 90-115

X3T9.2/90-99           Date:          Author: L. Lamers  [7/17/90]
Desc: Minutes of June 19, 1990 Cable Specification WG meeting
 Res: n.a.

X3T9.2/90-98           Date: 6/14/90  Author: B. Earle  [7/17/90]
Desc: Req. for Interpret. (#1) SCSI-2 Seq-access Partition Descriptors
 Res: (See 90-116)

X3T9.2/90-97           Date: 6/14/90  Author: B. Earle  [7/17/90]
Desc: Req. for Interpret. (#2) SCSI-2 Seq-access Recorded Obj. Identifiers
 Res: (See 90-117)

X3T9.2/90-96           Date: 6/19/90  Author: R. Cummings  [7/17/90]
Desc: Recent Fiber Channel Working Group Meetings Overview
 Res: n.a.

X3T9.2/90-95           Date: 6/18/90  Author: J. Kubinec  [7/17/90]
Desc: Serialized Data Communications Presentation
 Res: n.a.

X3T9.2/90-94           Date: 6/14/90  Author: J. Newman  [7/17/90]
Desc: Comments on Maxtor proposal for ANSI ESDI Specification
 Res: Only editorial clarifications will be made to ESDI

X3T9.2/90-93           Date: 6/18/90  Author: K. Chan  [7/17/90]
Desc: Single-ended crosstalk measurement results
 Res:

X3T9.2/90-92           Date: 6/17/90  Author: E. Jessen  [7/17/90]
Desc: Alternative Differential Standard and its impact
 Res: Erik will revise and host an ad hoc meeting

X3T9.2/90-91           Date: 6/18/90  Author: J. Fiala  [7/17/90]
Desc: Crosstalk/Capacitance Testing
 Res:

X3T9.2/90-90 Rev 1     Date: 6/26/90  Author: Lamers/ Lohmeyer  [7/17/90]
Desc: X3T9.2 Meeting #88 Minutes -- June 18-19, 1990
 Res: Minor revisions made at Aug meeting

X3T9.2/90-89           Date: 6/15/90  Author: B. Snively  [7/17/90]
Desc: Proposed requirement for Diagnostic Command Set
 Res:

X3T9.2/90-88           Date: 6/14/90  Author: T. Wicklund  [7/17/90]
Desc: Caching Page Proposal (Ref: Document 90-021 R2)
 Res: Discussion deferred until Boulder Meeting

X3T9.2/90-87           Date: 6/12/90  Author: T. Wicklund  [7/17/90]
Desc: Sequential Device Partition Definition
 Res: All partitions to be described

X3T9.2/90-86           Date: 6/8/90   Author: T. Wicklund  [7/17/90]
Desc: SCSI-2 Caching Page Problem
 Res: Accepted at June 90 meeting

X3T9.2/90-85           Date: 6/7/90   Author: J. Lohmeyer  [7/17/90]
Desc: Proposed clarifications to SCSI-2 re Reservations
 Res: Accepted at June 90 meeting

X3T9.2/90-84           Date: 5/29/90  Author: T. Wicklund  [7/17/90]
Desc: Comments on Maxtor questions about ESDI (ref:X3T9.2/90-074R1)
 Res: Only Editorial Changes will be done to ESDI

X3T9.2/90-83           Date: 6/8/90   Author: G. Houlder  [7/17/90]
Desc: Alternative Initiator Control of Reselection
 Res: Also see 90-62 (Last 2 par accepted w/o "Imp. note")

X3T9.2/90-82 Rev 1     Date: 5/31/90  Author: J. Lohmeyer  []
Desc: Revised letter to Ben Mattox re SCSI terminator and cable ad
 Res: n.a.

X3T9.2/90-81           Date: 5/14/90  Author: D. Pickford  [7/17/90]
Desc: Presentation and Minutes of the DCS session of Providence WG Meeting
 Res: n.a.

X3T9.2/90-80           Date: 5/15/90  Author: B. Spence  [5/17/90]
Desc: Proposal for Note re Aborting Arbitration
 Res: Revised note to be added to SCSI-2

X3T9.2/90-79           Date: 5/11/90  Author: J. Lohmeyer  [5/17/90]
Desc: High-Density System Interconnection Meeting Announcement
 Res: n.a.

X3T9.2/90-78           Date: 5/10/90  Author: L. Lamers  [5/17/90]
Desc: Cable Specification Working Group Minutes
 Res: n.a.

X3T9.2/90-77           Date: 5/8/90   Author: K. Chan  [5/17/90]
Desc: Single-ended crosstalk measurement proposal
 Res:

X3T9.2/90-76           Date: 5/9/90   Author: Lamers/ Lohmeyer  [5/17/90]
Desc: Providence Working Group Minutes
 Res: n.a.

X3T9.2/90-75           Date:          Author: H. Truestedt  [5/17/90]
Desc: July Working Group Meeting Notice
 Res: n.a.

X3T9.2/90-74 Rev 1     Date: 5/5/90   Author: L. Lamers  [5/17/90]
Desc: Request for ESDI Guidance and Interpretation
 Res: Only editorial changes will be incorporated

X3T9.2/90-73           Date: 5/3/90   Author: R. Snively  [5/17/90]
Desc: Proposed Structure for SCSI-3 Documentation
 Res:

X3T9.2/90-72           Date: 5/4/90   Author: C. Grant  [5/17/90]
Desc: Capacitance and Time Delay Testing
 Res:

X3T9.2/90-71           Date: 5/7/90   Author: T. Wicklund  [5/17/90]
Desc: Issues involved with RAID-3 disk arrays using SCSI drives
 Res: Presented to May '90 WG -- See 90-62

X3T9.2/90-70           Date: 5/3/90   Author: R. Snively  [5/17/90]
Desc: Editorial Error in SCSI-2 Rev 10C about Write Protect
 Res: June plenary accepted standard write protect language

X3T9.2/90-69           Date: 4/1/90   Author: G. Floryance  [5/17/90]
Desc: Transparent Fairness for Devices on the SCSI Bus
 Res: (Also see 89-61)

X3T9.2/90-68           Date: 5/4/90   Author: W. Xu  [5/17/90]
Desc: External Cable Evaluations - Analog Near End & Far End Crosstalk
 Res:

X3T9.2/90-67           Date: 4/10/90  Author: G. Milligan  [5/17/90]
Desc: Interaction on LOG SELECT TSD and DS bits
 Res: On June agenda

X3T9.2/90-66           Date: 4/27/90  Author: Lamers/ Lohmeyer  [5/17/90]
Desc: X3T9.2 Meeting #87 Minutes -- April 23-24, 1990
 Res: n.a.

X3T9.2/90-65           Date:          Author: J. Fiala  [5/17/90]
Desc: Back (NEXT) single-ended crosstalk testing
 Res:

X3T9.2/90-64 Rev 1     Date: 4/19/90  Author: J. Ellis  [5/17/90]
Desc: Shielded Cable Evaluation - Digital Near End Crosstalk
 Res:

X3T9.2/90-63           Date: 3/12/90  Author: Robertson & Pineau  [5/17/90]
Desc: ltrs accepting resolution of SCSI-2 public review comments #4 & #5
 Res:

X3T9.2/90-62 Rev 4     Date: 7/12/90  Author: J. Lohmeyer  [7/17/90]
Desc: Initiator Control of Reselection Order
 Res: Accepted for SCSI-3 at 8/90 meeting

X3T9.2/90-61           Date: 4/17/90  Author: J. Lohmeyer  [5/17/90]
Desc: ltr to B. Stephens re the committee's action on her membership
 Res:

X3T9.2/90-60           Date: 4/12/90  Author: B. Stephens  [5/17/90]
Desc: Ltr. re committee discrimination regarding her membership
 Res: (see 90-61)

X3T9.2/90-59           Date: 4/5/90   Author: G. Penokie  [5/17/90]
Desc: RESERVE command conflicts with Direct-Access Model
 Res: On June agenda

X3T9.2/90-58 Rev 2     Date: 6/22/90  Author: D. Allan  [5/17/90]
Desc: Project Proposal for AT Attachment
 Res: X3 LB closes 9/7/90

X3T9.2/90-57 Rev 3     Date: 6/22/90  Author: D. Allan  [5/17/90]
Desc: Project Proposal for SCSI Common Access Method
 Res: X3 LB closes 9/7/90

X3T9.2/90-56           Date: 3/19/90  Author: J. Flanagan  [5/17/90]
Desc: Appointment of Dal Allan as X3T9.2 Vice-Chairman
 Res:

X3T9.2/90-55           Date: 3/14/90  Author: D. Pickford  [3/19/90]
Desc: Presentation & Minutes of DCS Working Group Meeting @ Costa Mesa 3/7/90
 Res:

X3T9.2/90-54           Date: 3/13/90  Author: D. Shoemaker  [3/19/90]
Desc: Ltr to Ms. Judy Williams rejecting the Classic Conferences Proposal
 Res:

X3T9.2/90-53           Date: 3/15/90  Author: L. Barra  [3/19/90]
Desc: Letter to Brian Berg confirming his intention to withdraw 90-51
 Res: See 90-51

X3T9.2/90-52           Date: 3/12/90  Author: P. Joslin  [3/19/90]
Desc: Acceptance of res. to BSR X3.131-198x (SCSI-2) Public Review Comment #2
 Res: See (89-158 and 90-035)

X3T9.2/90-51           Date: 3/9/90   Author: B. Berg  [3/19/90]
Desc: Ltr rejecting committee response to SCSI-2 PR cmnts 7 and 8 (See 90-53)
 Res: See 90-24, 90-27, 90-40, and 90-53

X3T9.2/90-50           Date: 3/8/90   Author: Lamers/ Lohmeyer  [3/19/90]
Desc: Costa Mesa Working Group Minutes
 Res: n.a.

X3T9.2/90-49           Date: 3/8/90   Author: J. Lohmeyer  [3/19/90]
Desc: Letter to Alec Cawley re his REQUEST TEXT PROPOSAL (89-160)
 Res: Says WG rejected the proposal because of language issues

X3T9.2/90-48 Rev 7     Date: 10/30/90 Author: G. Penokie  [11/5/90]
Desc: 16/32 bit P/Q and L cable stand alone document
 Res: Complete doc w/parity handling rules for selection/reselection

X3T9.2/90-47           Date: 3/5/90   Author: G. Stephens  [3/19/90]
Desc: Modifying Actual Retry Count
 Res: (Response to 90-28)

X3T9.2/90-46           Date: 3/5/90   Author: B. Shah  [3/19/90]
Desc: Reporting Number of Blocks/Bytes in Target's Buffer
 Res: (Response to 90-28)

X3T9.2/90-45           Date: 2/22/90  Author: Lamers/ Lohmeyer  [3/19/90]
Desc: X3T9.2 Meeting #86 Minutes -- February 19-20, 1990
 Res: n.a.

X3T9.2/90-44           Date: 1/17/90  Author: J. Gibson  [3/19/90]
Desc: Proposed Digital Single End Mode NEXT Testing
 Res:

X3T9.2/90-43           Date: 2/15/90  Author: K. Chan  [3/19/90]
Desc: Shielded Cable Evaluation
 Res:

X3T9.2/90-42           Date: 3/1/90   Author: D. Shoemaker  [3/19/90]
Desc: Response to SCSI-2 PR Comment #10 (see 90-033)
 Res: Accepted by X3T9

X3T9.2/90-41           Date: 3/1/90   Author: D. Shoemaker  [3/19/90]
Desc: Response to SCSI-2 PR Comment #9 (see 90-030)
 Res: Accepted by X3T9

X3T9.2/90-40           Date: 3/1/90   Author: D. Shoemaker  [3/19/90]
Desc: Response to SCSI-2 PR Comments #7 and 8 (see 90-027 & 90-024)
 Res: Accepted by X3T9

X3T9.2/90-39           Date: 3/1/90   Author: D. Shoemaker  [3/19/90]
Desc: Response to SCSI-2 PR Comment #6 (see 90-008)
 Res: Accepted by X3T9

X3T9.2/90-38           Date: 3/1/90   Author: D. Shoemaker  [3/19/90]
Desc: Response to SCSI-2 PR Comment #5 (see 89-152)
 Res: Accepted by X3T9

X3T9.2/90-37           Date: 3/1/90   Author: D. Shoemaker  [3/19/90]
Desc: Response to SCSI-2 PR Comment #4 (see 89-144)
 Res: Accepted by X3T9

X3T9.2/90-36           Date: 3/1/90   Author: D. Shoemaker  [3/19/90]
Desc: Response to SCSI-2 PR Comment #3 (see 89-140)
 Res: Accepted by X3T9

X3T9.2/90-35           Date: 3/1/90   Author: D. Shoemaker  [3/19/90]
Desc: Response to SCSI-2 PR Comment #2 (see 89-158)
 Res: Accepted by X3T9

X3T9.2/90-34           Date: 2/12/90  Author: D. Allan  [3/19/90]
Desc: Ltr listing additional candidates for X3T9 meeting planners
 Res: Given to X3T9

X3T9.2/90-33           Date: 2/15/90  Author: Pfleg and Herron  [3/19/90]
Desc: SCSI-2 Public Review Comment #10 (re: Ribbon contact connector)
 Res: No change requested (see 90-42)

X3T9.2/90-32           Date: 2/16/90  Author: J. Lohmeyer  [3/19/90]
Desc: Letter to Alec Cawley re the Paintbox Remote Access Port
 Res: n.a.

X3T9.2/90-31           Date: 2/13/90  Author: A. Cawley  [3/19/90]
Desc: Letter enclosing "non-confidential" spec on Paintbox Remote Access Port
 Res: See 90-32

X3T9.2/90-30           Date: 2/13/90  Author: E. Tausheck  [3/19/90]
Desc: SCSI-2 Public Review Comment #9 (re: AEN Operation)
 Res: Rejected (see 90-41)

X3T9.2/90-29           Date: 2/8/90   Author: N. Lee  [3/19/90]
Desc: Request that Act Technology membership in X3T9.2 be retained
 Res: Not accepted

X3T9.2/90-28 Rev 1     Date: 3/4/90   Author: M. Racelo  [3/19/90]
Desc: Modifying Actual Retry Count/Adding Unrecorded Block Count in Buffer
 Res: See 90-46 and 90-47 Is filemark/setmark reporting necessary?

X3T9.2/90-27           Date: 1/24/90  Author: B. Berg  [3/19/90]
Desc: SCSI-2 Public Review Comment #7 (re: Suggested Improvements)
 Res: Partially accepted (see 90-40)

X3T9.2/90-26           Date:          Author: P. Blackford  [1/17/90]
Desc: May '90 Working Group Meeting Announcement
 Res: n.a.

X3T9.2/90-25           Date:          Author: J. Stai  [1/17/90]
Desc: March '90 Working Group Meeting Announcement
 Res: n.a.

X3T9.2/90-24           Date: 1/12/90  Author: B. Berg  [1/17/90]
Desc: SCSI-2 Public Review Comment #8 (re: Errors in Table I-2)
 Res: Partially accepted (see 90-40)

X3T9.2/90-23           Date: 1/11/90  Author: L. Lamers  [1/17/90]
Desc: Cable Working Group Minutes - January 1990
 Res: n.a.

X3T9.2/90-22           Date: 12/11/89 Author: D. Pickford  [1/17/90]
Desc: SCSI Diagnostic Model - Rigid Disk Drives
 Res: On agenda for March WG (3/7/90 a.m.)

X3T9.2/90-21 Rev 4     Date: 10/29/90 Author: G. Milligan  [11/5/90]
Desc: Additional SCSI Caching Control
 Res: Accepted for SCSI-3 at Dec '90 meeting

X3T9.2/90-20           Date: 1/4/90   Author: K. Chan  [1/17/90]
Desc: Shielded Cable TDR Measurements
 Res:

X3T9.2/90-19           Date:          Author: J. Filia  [1/17/90]
Desc: Impedance Nomograph
 Res:

X3T9.2/90-18           Date:          Author: J. Filia  [1/17/90]
Desc: Cable Test Methods
 Res:

X3T9.2/90-17           Date: 12/20/89 Author: J. Gibson  [1/17/90]
Desc: Proposed Near End Crosstalk Measurement Procedures
 Res:

X3T9.2/90-16           Date: 1/5/90   Author: C. Grant  [1/17/90]
Desc: Near End Crosstalk Measurement
 Res:

X3T9.2/90-15           Date:          Author: L. Lamers  []
Desc:
 Res:

X3T9.2/90-14           Date:          Author: L. Lamers  []
Desc:
 Res:

X3T9.2/90-13           Date:          Author: L. Lamers  []
Desc:
 Res:

X3T9.2/90-12           Date:          Author: L. Lamers  []
Desc:
 Res:

X3T9.2/90-11           Date:          Author: L. Lamers  []
Desc:
 Res:

X3T9.2/90-10           Date:          Author: L. Lamers  []
Desc:
 Res: 90-10 through 90-15 reserved for SCSI-3 draft documents

X3T9.2/90-9            Date: 1/11/90  Author: Lamers/ Lohmeyer  [1/17/90]
Desc: San Jose Working Group Minutes
 Res: n.a.

X3T9.2/90-8            Date: 11/30/89 Author: R. Graczyk  [1/17/90]
Desc: SCSI-2 Public Review Comment #6 (re: High Density Connector)
 Res: Rejected (see 90-39)

X3T9.2/89-7            Date: 1/9/90   Author: B. Spence  [1/17/90]
Desc: Proposal for a Note re Writing to EOP (PEOT)
 Res: Note to be added in S2R10c

X3T9.2/89-6            Date: 12/28/89 Author: G. Penokie  [1/17/90]
Desc: 16/32-bit P/L Cable Stand Alone Document
 Res:

X3T9.2/89-5            Date: 12/28/89 Author: G. Penokie  [1/17/90]
Desc: 16/32-bit P/Q Cable Stand Alone Document
 Res:

X3T9.2/90-4            Date: 12/28/89 Author: G. Penokie  [1/17/90]
Desc: 32-bit Data Path on a Single 110-pin Connector (L Cable)
 Res:

X3T9.2/90-3 Rev 2      Date: 1/15/90  Author: G. Houlder  [3/19/90]
Desc: SCSI-1 and CCS Implementation on a SCSI-2 Target
 Res: Implementors Note to be added to S2R10c

X3T9.2/90-2            Date: 12/22/89 Author: G. Houlder  [1/17/90]
Desc: Clarification of Multi-Initiator Tagged Queuing
 Res: Jan '90 WG recommends per-initiator basis

X3T9.2/90-1            Date: 1/3/90   Author: J. Lohmeyer  [1/17/90]
Desc: X3T9.2 Annual Report
 Res: n.a.

X3T9.2/89-161          Date: 12/18/89 Author: J. Lohmeyer  [1/17/90]
Desc: Response letter to Alec Cawley (Quantel)
 Res: Assigns vendor ID -- Proposed REQUEST TEXT SENSE to be WG item

X3T9.2/89-160          Date: 12/5/89  Author: A. Cawley  [1/17/90]
Desc: Vendor ID request and Proposed REQUEST TEXT SENSE Command
 Res: See 89-161 and 90-49

X3T9.2/89-159          Date: 11/30/89 Author: D. Shoemaker  [1/17/90]
Desc: Response to BSR X3.131-198x Public Review Comment #1 (see 89-106)
 Res: Reject's the Robinson Nugent Comment

X3T9.2/89-158          Date: 10/23/89 Author: P. Joslin  [1/17/90]
Desc: SCSI-2 Public Review Comment #2 (Re: Scanner Cmnd Set)
 Res: Jan '90 WG recommends waiting for SCSI-3

X3T9.2/89-157          Date: 12/4/89  Author: G. Crow  [1/17/90]
Desc: Proposed 16 bit SCSI
 Res: Opposes removing B cable from SCSI-2

X3T9.2/89-156          Date:          Author: D. Shoemaker  [1/17/90]
Desc: Notes on SC-25 TAG Meeting ANSI NYC, Dec 1, 1989
 Res: Presented at Dec. '89 Plenary

X3T9.2/89-155          Date:          Author: D. Shoemaker  [1/17/90]
Desc: Notes on SC-25 Meeting Milan, Italy, Oct 31 - Nov 1, 1989
 Res: Presented at Dec. '89 Plenary

X3T9.2/89-154          Date: 12/1/89  Author: J. Iamartino  [1/17/90]
Desc: DECconnect Media Lab Evaluation of SCSI-2 Cables
 Res: Presented at Dec. '89 Plenary

X3T9.2/89-153          Date: 12/4/89  Author: L. Lamers  [1/17/90]
Desc: Minutes of 12/4/89 Cable Impedance Working Group
 Res: n.a.

X3T9.2/89-152          Date: 12/1/89  Author: Robertson/ Cornaby  [1/17/90]
Desc: SCSI-2 Public Review Comment #5 (re: Caching)
 Res: Jan '90 WG recommends waiting for SCSI-3

X3T9.2/89-151          Date: 11/27/89 Author: B. Fairman  [1/17/90]
Desc: Using Logical Block Format to handle defects
 Res:

X3T9.2/89-150 Rev 1    Date: 12/28/89 Author: G. Penokie  [1/17/90]
Desc: 16 Bit Data Path on a single 68-pin Connector (Appendix form)
 Res:

X3T9.2/89-149 Rev 1    Date: 2/21/90  Author: Lamers/ Lohmeyer  [1/17/90]
Desc: X3T9.2 Meeting #85 Minutes -- December 4-5, 1989
 Res: n.a.

X3T9.2/89-148          Date: 12/1/89  Author: B. Spence  [1/17/90]
Desc: Single-Ended Cable Test Report
 Res:

X3T9.2/89-147          Date: 12/1/89  Author: B. Spence  [1/17/90]
Desc: Reflections on Writing to EOT
 Res: Jan '90 WG recommends 90-007 be accepted

X3T9.2/89-146          Date:          Author: R. Snively  [1/17/90]
Desc: Suggested Editorial Correction of Tape Density Parameter
 Res: Accepted

X3T9.2/89-145 Rev 1    Date: 12/5/89  Author: G. Penokie  [1/17/90]
Desc: Proposed additional ASCQs for SCSI-2
 Res: Accepted

X3T9.2/89-144          Date: 11/13/89 Author: S. Cornaby  [1/17/90]
Desc: SCSI-2 Public Review Comment #4 (Re: 16-bit cable)
 Res: Jan '90 WG recommends waiting for SCSI-3

X3T9.2/89-143          Date: 11/1/89  Author: C. Grant  [11/6/89]
Desc: SCSI-2 Cable Testing Procedures
 Res:

X3T9.2/89-142          Date: 10/31/89 Author: W. Xu  [11/6/89]
Desc: Cable Test Comparison Report
 Res:

X3T9.2/89-141          Date:          Author: R. Snively  [11/6/89]
Desc: Meeting Notice January 1990 CAM, SCSI, and Fiber Channel Meetings
 Res: n.a.

X3T9.2/89-140          Date: 11/3/89  Author: J. Stai  [11/6/89]
Desc: SCSI-2 Public Review Comment #3 (re: 16-bit single-cable option)
 Res: On Agenda for Dec '89 meeting

X3T9.2/89-139 Rev 1    Date: 12/2/89  Author: D. Allan  [1/17/90]
Desc: Summary of ESDI Editing Changes from Rev 3 to Present
 Res: Accepted at the Dec '89 meeting

X3T9.2/89-138          Date: 11/1/89  Author: Lamers/ Lohmeyer  [11/6/89]
Desc: Santa Ana Working Group Minutes
 Res: n.a.

X3T9.2/89-137          Date: 10/27/89 Author: R. Yomtov  [11/6/89]
Desc: Testing Recommendation to the SCSI subcommittee
 Res: Presented at the Santa Ana WG Meeting

X3T9.2/89-136          Date:          Author: D. Pickford  [11/6/89]
Desc: Slides from Santa Ana Presentation on 89-135
 Res: n.a.

X3T9.2/89-135          Date: 10/27/89 Author: D. Pickford  [11/6/89]
Desc: Draft Proposal for a SCSI Diagnostic Command Set (DCS)
 Res: Presented at the Santa Ana WG Meeting

X3T9.2/89-134          Date: 10/30/89 Author: R. Dominguez  [11/6/89]
Desc: Proposed SCSI Diagnostic Enhancements
 Res: Presented at the Santa Ana WG Meeting

X3T9.2/89-133 Rev 3    Date: 9/6/90   Author: G. Stephens  [11/5/90]
Desc: Logical Model for SCSI-3 Parallel Busses
 Res:

X3T9.2/89-132          Date: 10/27/89 Author: G. Murdock  [11/6/89]
Desc: Long Distance, Small Swing Differential SCSI Transceiver
 Res: Presented at Santa Ana WG Meeting

X3T9.2/89-131          Date: 10/27/89 Author: G. Murdock  [11/6/89]
Desc: Short Distance Differential SCSI Transceiver
 Res: Presented at Santa Ana WG Meeting

X3T9.2/89-130 Rev 1    Date:          Author: G. Stephens  [1/17/90]
Desc: Proposed Parallel Packet Structure for SCSI-3
 Res:

X3T9.2/89-129          Date: 10/10/89 Author: L. Barra  [11/6/89]
Desc: Transmittal letter of ESDI to ANSI
 Res: n.a.

X3T9.2/89-128          Date: 10/10/89 Author: L. Barra  [11/6/89]
Desc: X3 Letter Ballot results on ESDI (BSR X3.170-198x)  34-0-2-4
 Res: n.a.

X3T9.2/89-127          Date:          Author: B. Spence  [11/6/89]
Desc: MODE SENSE Page Code 00
 Res: Implementors note will be added.

X3T9.2/89-126          Date: 10/18/89 Author: Lamers/ Lohmeyer  [11/6/89]
Desc: X3T9.2 Meeting #84 Minutes -- October 16-17, 1989
 Res: n.a.

X3T9.2/89-125          Date: 10/6/89  Author: J. Flanagan  [11/6/89]
Desc: Call for Volunteers -- X3T9.2 Chairman and Vice Chairman
 Res: Announced at October plenary meeting

X3T9.2/89-124          Date: 9/28/89  Author: C. Curry  [11/6/89]
Desc: Differential SCSI Concerns
 Res: Deferred to January 1990 WG

X3T9.2/89-123          Date: 10/4/89  Author: J. Gibson  [11/6/89]
Desc: Agenda Topics for Cable Testing and Performance Meeting
 Res:

X3T9.2/89-122          Date: 9/20/89  Author: L. Barra  [11/6/89]
Desc: Transmittal of SCSI-2 to ANSI for Public Review
 Res: n.a.

X3T9.2/89-121          Date:          Author: D. Allan  [9/11/89]
Desc: ESDI changes from Rev 3 to Rev 3A
 Res: Includes June '89 changes plus August '89 clarifications

X3T9.2/89-120          Date: 9/8/89   Author: Lamers/ Lohmeyer  [9/11/89]
Desc: Oklahoma City Working Group Minutes
 Res: n.a.

X3T9.2/89-119          Date: 8/21/89  Author: A. Hospodor  [9/11/89]
Desc: preliminary working draft Diagnostic Command Set for SCSI and SCSI-2
 Res: To be reviewed October 31 in Irvine WG

X3T9.2/89-118          Date: 8/18/89  Author: R. Cummings  [9/11/89]
Desc: An Introduction to/update on the Fiber Channel
 Res: Presented at Aug '89 meeting

X3T9.2/89-117          Date: 8/21/89  Author: B. Homans  [9/11/89]
Desc: Standard INQUIRY Data Format
 Res: Device-Type Modifier field added in S2R10b

X3T9.2/89-116          Date: 8/19/89  Author: Chan/ Matheson  [9/11/89]
Desc: Shielded Cable Evaluation
 Res: Presented Aug '89

X3T9.2/89-115 Rev 1    Date: 10/15/89 Author: Chan/ Matheson  [11/6/89]
Desc: Alternative 2 Termination: Worst-Case Analysis and Recommendations
 Res: Revised at Raleigh

X3T9.2/89-114          Date: 8/17/89  Author: P. Boulay  [9/11/89]
Desc: SCSI-2 CD-ROm Command Set Changes
 Res: Accepted for S2R10b

X3T9.2/89-113          Date: 8/18/89  Author: L. Lamers  [9/11/89]
Desc: ESDI Rev. 3A Clarification
 Res: Accepted with other clarifications

X3T9.2/89-112          Date: 8/17/89  Author: R. Snively  [9/11/89]
Desc: Comments on 16-bit Single-Connector Proposal
 Res: Assigned to OKC WG meeting

X3T9.2/89-111          Date: 8/23/89  Author: Lamers/ Lohmeyer  [9/11/89]
Desc: X3T9.2 Meeting #83 Minutes -- August 21-22, 1989
 Res: n.a.

X3T9.2/89-110          Date: 8/17/89  Author: G. Houlder  [9/11/89]
Desc: Target Initiated SDTR Message Control
 Res: Assigned to OKC WG

X3T9.2/89-109 Rev 1    Date: 8/28/89  Author: G. Houlder  [9/11/89]
Desc: New COPY Segment Descriptors for Wide SCSI-3
 Res: Assigned to OKC WG

X3T9.2/89-108 Rev 1    Date: 8/10/89  Author: R. Lin  [9/11/89]
Desc: Sony Proposal for CD-ROM Device
 Res: Mostly included in S2R10A

X3T9.2/89-107          Date: 8/10/89  Author: K. Kumazawa  [9/11/89]
Desc: ESDI Synchronous Spindle Configuration Parameter
 Res: Unsync'd value is now 02h

X3T9.2/89-106          Date: 8/9/89   Author: B. Mattox  [9/11/89]
Desc: SCSI-2 Public Review Comment #1 (re: high-density ribbon contacts)
 Res: Rejected -- see 89-159

X3T9.2/89-105          Date: 8/15/89  Author: J. Lohmeyer  [9/11/89]
Desc: Ltr to A. Hospodor re his August 9 letter (see 89-104)
 Res: n.a.

X3T9.2/89-104          Date: 8/9/89   Author: A. Hospodor  [9/11/89]
Desc: Ltr. to J. Lohmeyer re X3B7.1 Activities
 Res: see 89-105

X3T9.2/89-103 Rev 1    Date: 9/6/89   Author: T. Wicklund  [9/11/89]
Desc: Comments on SCSI-2 Rev 10
 Res: Most included in S2R10A

X3T9.2/89-102          Date: 8/7/89   Author: D. Allan  [9/11/89]
Desc: Correction to ESDI document
 Res: Unsync'd value is now 02h

X3T9.2/89-101          Date: 8/4/89   Author: G. Penokie  [9/11/89]
Desc: Maximum Burst Size Rounding Definition
 Res: Accepted

X3T9.2/89-100 Rev 1    Date:          Author: K. Post  [9/11/89]
Desc: 'November' Working Group Meeting Notice
 Res: n.a.

X3T9.2/89-99           Date: 7/3/89   Author: K. Ebina  [7/17/89]
Desc: Request to add "FUJI" as vendorID for "Fuji Electric Co., Ltd. (Japan)"
 Res: Done in S2R10A

X3T9.2/89-98           Date: 7/6/89   Author: R. Lin  [7/17/89]
Desc: Sony "No" vote on SCSI-2 Forwarding Motion
 Res: See also 89-95 and 89-108

X3T9.2/89-97           Date: 7/8/89   Author: G. Houlder  [7/17/89]
Desc: 16-bit SCSI-3 Protocol
 Res:

X3T9.2/89-96           Date: 7/7/89   Author: G. Houlder  [7/17/89]
Desc: LOG Counter Definitions
 Res: Implementors note to be added instead

X3T9.2/89-95 Rev 1     Date: 7/17/89  Author: P. Boulay  [7/17/89]
Desc: Read Subchannel Command Revision
 Res: Possible Alternative to Sony Proposal (89-98)

X3T9.2/89-94 Rev 6     Date: 12/28/89 Author: G. Penokie  [1/17/90]
Desc: 16 Bit Data Path on a Single 68-pin Connector
 Res:

X3T9.2/89-93           Date: 6/22/89  Author: K. Newton  [7/17/89]
Desc: Request to add "RADSTONE" as Vendor ID for "Radstone Technology"
 Res: Will add to next Rev of SCSI-2

X3T9.2/89-92           Date: 6/1/89   Author: P. Blackford  [7/17/89]
Desc: SCSI-2 Cable Considerations - A Summary
 Res: Presentation made at June Plenary meeting

X3T9.2/89-91           Date: 6/26/89  Author: L. Lamers  [7/17/89]
Desc: Ltr. to Shoemaker saying ESDI Rev 3A resolves their PR comment
 Res: Ref 89-68, 89-84

X3T9.2/89-90           Date: 7/12/89  Author: Lamers/ Lohmeyer  [7/17/89]
Desc: Chicago Working Group Minutes
 Res: n.a.

X3T9.2/89-89           Date: 7/3/89   Author: J. Lohmeyer  [7/17/89]
Desc: Ltr. to D. Wong regarding SCSI-2 connectors
 Res: Response to 89-88

X3T9.2/89-88           Date: 6/21/89  Author: D. Wong  [7/17/89]
Desc: Ltr. to J. Lohmeyer requesting SCSI-2 consider ribbon contact design
 Res: see 89-89

X3T9.2/89-87           Date: 6/16/89  Author: J. Pickitt  [7/17/89]
Desc: 1990-1991 Fees for Participation in X3, JTC1/TAG and their subgroups
 Res: Inflation strikes again.

X3T9.2/89-86           Date: 6/28/89  Author: J. Lohmeyer  [7/17/89]
Desc: Letter to Gene Milligan transmitting SCSI-2 Rev 10 for ISO
 Res: n.a.

X3T9.2/89-85           Date: 6/19/89  Author: J. Urban  [7/17/89]
Desc: Fujitsu Business Intentions with regard to SCSI-2 Connectors
 Res: n.a.

X3T9.2/89-84           Date: 6/15/89  Author: D. Allan  [7/17/89]
Desc: Letter detailing editorial clarifications to ESDI
 Res: Resolves Maxtor PR Comment (see 89-68)

X3T9.2/89-83           Date: 6/16/89  Author: G. Milligan  [7/17/89]
Desc: SCSI WG Meeting Announcement Sept 6-7 (CAM Sept 8)
 Res: n.a.

X3T9.2/89-82           Date: 6/14/89  Author: K. Chan  [7/17/89]
Desc: Elaboration on TERMPWR decoupling
 Res: Revised IMP. NOTE to recommend 2.2 uf Cap. on Terminators

X3T9.2/89-81           Date: 6/15/89  Author: K. Chan  [7/17/89]
Desc: Round 2, SCSI Cable Comparisons
 Res: n.a.

X3T9.2/89-80           Date: 6/15/89  Author: R. Snively  [7/17/89]
Desc: Proposal to provide function of EXTENDED IDENTIFY
 Res: Accepted

X3T9.2/89-79           Date: 6/11/89  Author: B. Spence  [7/17/89]
Desc: Practical Proposal Re SDTR Responsibility
 Res: Even...we...accept some practical proposals.

X3T9.2/89-78           Date: 6/8/89   Author: D. Smith  [7/17/89]
Desc: AMP statement re licensing their US Patent 4,808,125
 Res: (Also see 89-46 and 89-56)

X3T9.2/89-77           Date: 6/12/89  Author: W. Smythe  [7/17/89]
Desc: IT8 Draft Document and Request for Two SCSI Device Types
 Res: J. Lohmeyer to discuss with W. Smythe

X3T9.2/89-76           Date: 6/9/89   Author: R. Coulson  [7/17/89]
Desc: EMI and .050 Series Connectors
 Res: No resolution req'd. See 89-075.

X3T9.2/89-75 Rev 1     Date: 8/29/89  Author: Lamers/ Lohmeyer  [7/17/89]
Desc: X3T9.2 Meeting #82 Minutes -- June 19-20, 1989
 Res: n.a.

X3T9.2/89-74           Date: 5/19/89  Author: D. Hatch  [7/17/89]
Desc: Letter saying Stewart plans to re-propose Daisy-Gen connector for SCSI2
 Res: Rejected by June plenary 6 Yes, 32 No

X3T9.2/89-73           Date: 5/17/89  Author: J. Lohmeyer  [5/17/89]
Desc: Letter to Del Shoemaker saying NCR X3T9 comment on SCSI-2 is resolved
 Res: n.a.

X3T9.2/89-72           Date: 5/17/89  Author: J. Lohmeyer  [5/17/89]
Desc: Letter to Bob Dugan responding to his X3T9 SCSI-2 comment
 Res: Comment resolved in S2R9

X3T9.2/89-71           Date: 5/17/89  Author: J. Lohmeyer  [5/17/89]
Desc: Letter to Mi Le responding to her X3T9 SCSI-2 comment
 Res: Comment resolved in S2R9

X3T9.2/89-70           Date: 5/17/89  Author: J. Lohmeyer  [5/17/89]
Desc: Letter to Gene Milligan responding to his X3T9 SCSI-2 comments
 Res: Reference 89-055

X3T9.2/89-69           Date: 5/16/89  Author: J. Lohmeyer  [5/17/89]
Desc: Letter to Arnold Roccati responding to his X3T9 SCSI-2 comments
 Res: Reference 89-067

X3T9.2/89-68           Date: 5/5/89   Author: M. Rice  [5/17/89]
Desc: Maxtor Public Review Comment on ESDI Revision 3 (X3.170-198X)
 Res: Resolved in ESDI 3a without substantive changes

X3T9.2/89-67           Date: 3/17/89  Author: A. Roccati  [5/17/89]
Desc: X3T9 Letter Ballot comments on SCSI-2 (X3T9/89-042 - 16 March 89)
 Res: ref 89-069

X3T9.2/89-66           Date: 5/10/89  Author: Lamers/ Lohmeyer  [5/17/89]
Desc: Wichita Working Group Minutes
 Res: n.a.

X3T9.2/89-65           Date: 5/5/89   Author: D. Buesing  [5/17/89]
Desc: SCSI Bus Fairness through Selective Reconnection
 Res: On agenda for Chicago WG

X3T9.2/89-64           Date: 5/4/89   Author: M. Eneboe  [5/17/89]
Desc: Proposed changes to SCSI-2 Rev 8 regarding queuing
 Res: Accepted with revisions from Snively

X3T9.2/89-63           Date: 5/3/89   Author: S. Cornaby  [5/17/89]
Desc: Physical Seek Function within SEND DIAGNOSTIC
 Res: assigned to the SCSI-3 queue

X3T9.2/89-62           Date: 5/7/89   Author: B. Spence  [5/17/89]
Desc: REQUEST SENSE Response to Selection of an Invalid LU
 Res: Accepted

X3T9.2/89-61           Date: 5/5/89   Author: G. Penokie  [5/17/89]
Desc: SCSI Bus Fairness Technique
 Res: On Chicago WG Agenda

X3T9.2/89-60           Date: 4/20/89  Author: D. Allan  [5/17/89]
Desc: United and Northwest discount air fare numbers
 Res: Thank you, Dal

X3T9.2/89-59           Date: 4/20/89  Author: J. Lawlor  [5/17/89]
Desc: July working group meeting announcement
 Res: n.a.

X3T9.2/89-58           Date: 4/14/89  Author: J. Lohmeyer  [5/17/89]
Desc: NCR "No" vote on SCSI-2 letter ballot (X3T9/89-41)
 Res: Resolved in S2R9

X3T9.2/89-57           Date: 4/20/89  Author: Chan/ Matheson  [5/17/89]
Desc: AMP SCSI-2 Cable Comparisons
 Res: see 4/89 minutes

X3T9.2/89-56           Date: 4/24/89  Author: D. Smith  [5/17/89]
Desc: Letter saying AMP patent #4,808,125 outside scope of SCSI-2 draft stnd.
 Res: see 4/89 minutes

X3T9.2/89-55 Rev 1     Date: 4/16/89  Author: G. Milligan  [5/17/89]
Desc: Comments accompanying his X3T9 letter ballot
 Res: See S2R9

X3T9.2/89-54           Date: 4/21/89  Author: D. Appleyard  [5/17/89]
Desc: MESSAGE PARITY ERROR message
 Res: Accepted with mods in S2R9

X3T9.2/89-53           Date: 4/21/89  Author: T. Wicklund  [5/17/89]
Desc: SCSI-2 R8 comments
 Res: Most accepted for S2R9

X3T9.2/89-52           Date: 4/12/89  Author: Campbell/ Kalin  [5/17/89]
Desc: Measurements of REQ&ACK using AMP connector
 Res: Presented to 4/89 plenary meeting

X3T9.2/89-51           Date: 4/11/89  Author: Campbell/ Kalin  [5/17/89]
Desc: Measurements of REQ&ACK using 3M connector
 Res: Presented to 4/89 plenary meeting

X3T9.2/89-50 Rev 1     Date: 5/9/89   Author: D. Davies  [5/17/89]
Desc: Proposed changes and corrections to SCSI-2 R8, Section 9
 Res: Accepted

X3T9.2/89-49           Date: 4/26/89  Author: Lamers/ Lohmeyer  [5/17/89]
Desc: X3T9.2 Meeting #81 Minutes -- April 24-25, 1989
 Res: n.a.

X3T9.2/89-48           Date: 4/24/89  Author: R. Snively  [5/17/89]
Desc: Sun Cable Testing Results
 Res: See 4/89 minutes

X3T9.2/89-47           Date: 4/11/89  Author: J. Lohmeyer  [5/17/89]
Desc: Overriding Device Reservations and Pending Commands
 Res: Assigned to SCSI-3

X3T9.2/89-46           Date: 4/5/89   Author: D. Goodman  [5/17/89]
Desc: Letter concerning AMP patent #4,808,125
 Res: See 4/89 minutes

X3T9.2/89-45           Date: 3/10/89  Author: R. Cummings  [3/17/89]
Desc: Fiber Optic Channel Working Group Minutes (1/30-31/89)
 Res: .a.

X3T9.2/89-44           Date:          Author: Chan/ Bramhall  [3/17/89]
Desc: Request to reconsider 89-021 for SAD underlength issue
 Res: 89-50 Accepted

X3T9.2/89-43           Date:          Author: B. Duran  [3/17/89]
Desc: Proposed Sequential-Access Density Code
 Res: Accepted by 4/89 plenary

X3T9.2/89-42           Date: 3/14/89  Author: Lamers/ Lohmeyer  [3/17/89]
Desc: Milpitas Working Group Minutes
 Res: n.a.

X3T9.2/89-41           Date: 3/2/89   Author: J. Lohmeyer  [3/17/89]
Desc: May Working Group and CAM Meeting Announcement
 Res: n.a.

X3T9.2/89-40           Date: 2/17/89  Author: J. Morse  [3/17/89]
Desc: SCSI Cable Test Configurations
 Res: Presentation to 2/89 plenary

X3T9.2/89-39 Rev 1     Date: 4/22/89  Author: Rikkonen et. al.  [5/17/89]
Desc: SCSI-2 Cable Testing Summary Report
 Res: Presentation to 4/89 plenary

X3T9.2/89-38 Rev 1     Date: 4/21/89  Author: V. Novak  [5/17/89]
Desc: SCSI-2 Cable Testing Report
 Res: Presentation to 4/89 plenary

X3T9.2/89-37           Date: 2/20/89  Author: Boulay/ Pentecost  [3/17/89]
Desc: Medium Changer Element Status Descriptors
 Res: Accepted

X3T9.2/89-36 Rev 1     Date: 9/8/89   Author: G. Stephens  [9/11/89]
Desc: Preparations for new physical layer(s)
 Res: Reviewed at OKC WG -- controversial

X3T9.2/89-35           Date: 2/20/89  Author: D. Davies  [3/17/89]
Desc: Tape Read Overlength Detection w/SILI Bit
 Res: Accepted

X3T9.2/89-34           Date: 2/17/89  Author: D. Appleyard  [3/17/89]
Desc: No Operation Message
 Res: Accepted except it should be an example of the NO OP message

X3T9.2/89-33           Date: 2/17/89  Author: D. Appleyard  [3/17/89]
Desc: Attention Condition Timing Delays
 Res: Accepted except delay will be "2 deskew delays"

X3T9.2/89-32           Date: 2/16/89  Author: P. Bramhill  [3/17/89]
Desc: Comments on SCSI-2 Working Draft Rev 7
 Res: Mostly accepted

X3T9.2/89-31           Date: 2/10/89  Author: B. Pentecost  [3/17/89]
Desc: DA FORMAT UNIT command, IP Modifier
 Res: Accepted

X3T9.2/89-30           Date: 2/18/89  Author: P. Nitza  [3/17/89]
Desc: Review of SCSI-2 Revision 7
 Res: Mostly accepted for S2R8

X3T9.2/89-29           Date: 2/16/89  Author: J. Lohmeyer  [3/17/89]
Desc: Letter to W.E. Burr thanking him for preparing ISO 9316:1989 (SCSI)
 Res: n.a.

X3T9.2/89-28           Date: 2/21/89  Author: Lamers/ Lohmeyer  [3/17/89]
Desc: X3T9.2 Meeting #80 Minutes -- February 20-21, 1989
 Res: n.a.

X3T9.2/89-27           Date: 2/14/89  Author: Weber & Hoglund  [3/17/89]
Desc: ESDI Version 3.0 satisfies NCR PR comment
 Res: n.a.

X3T9.2/89-26           Date: 2/6/89   Author: J. McGrath  []
Desc: March 6-8, 1989 SCSI Working Group and CAM Meeting Announcement
 Res: n.a.

X3T9.2/89-25           Date: 1/26/89  Author: J. Lohmeyer  [3/17/89]
Desc: SEARCH DATA Transfer Length Inconsistency
 Res: Transfer length will be the number of blocks

X3T9.2/89-24           Date: 1/24/89  Author: J. Lohmeyer  [3/17/89]
Desc: When not to clear sense data
 Res: Rejected

X3T9.2/89-23           Date: 1/14/89  Author: D. Allan  [1/20/89]
Desc: Synchronized Sector Offset for ESDI
 Res: Accepted

X3T9.2/89-22           Date: 1/6/89   Author: L. Groenke  [1/20/89]
Desc: ISO/IEC JTC 1 Project 13.10.12 SCSI-2
 Res: ISO/IEC proposed new work item on SCSI-2

X3T9.2/89-21           Date: 1/17/89  Author: Penokie/ Clegg  [1/20/89]
Desc: Tape Read Underlength Detection
 Res: Withdrawn by IBM in favor of 89-35

X3T9.2/89-20           Date: 1/4/89   Author: R. Cummings  [1/20/89]
Desc: Fiber Optic Channel Working Group Minutes
 Res: n.a.

X3T9.2/89-19 Rev 1     Date: 1/12/89  Author: Lamers/ Lohmeyer  [1/20/89]
Desc: Costa Mesa Working Group Minutes
 Res: n.a.

X3T9.2/89-18           Date: 1/12/89  Author: K. Chan  [1/20/89]
Desc: Preliminary Cable Test Results
 Res: report to January '89 WG

X3T9.2/89-17           Date: 1/10/89  Author: P. Bramhill  [1/20/89]
Desc: Introduce a new optional command
 Res: Put in SCSI-3 queue

X3T9.2/89-16 Rev 1     Date: 1/10/89  Author: P. Bramhill  [1/20/89]
Desc: Active Format field in Device Configuration Parameters Page
 Res: Some of the information was added to the Error Recovery Page

X3T9.2/89-15           Date: 1/6/89   Author: B. Pentecost  [1/20/89]
Desc: Write with Length = 0
 Res: Rejected

X3T9.2/89-14           Date: 1/6/89   Author: B. Pentecost  [1/20/89]
Desc: READ POSITION Command
 Res: Partially accepted

X3T9.2/89-13 Rev 1     Date: 1/9/89   Author: P. Bramhill  [1/20/89]
Desc: 9.2.13 SPACE Command, Rev 6a, page 9-30
 Res: Rejected

X3T9.2/89-12 Rev 1     Date: 1/9/89   Author: P. Bramhill  [1/20/89]
Desc: Separation of BOM and BOP0
 Res: Accepted

X3T9.2/89-11           Date: 1/9/89   Author: P. Bramhill  [1/20/89]
Desc: MODE SELECT Device Configuration Parameters
 Res: Accepted

X3T9.2/89-10           Date: 1/9/89   Author: P. Bramhill  [1/20/89]
Desc: REQUEST SENSE EOM data on Partitioned Tape
 Res: "medium" should be "partition"

X3T9.2/89-9            Date: 1/9/89   Author: P. Bramhill  [1/20/89]
Desc: COPY and Partitioned Tape
 Res: "end-of-medium" changed to "end-of-partition"

X3T9.2/89-8 Rev 1      Date:          Author: Stephens/ Davies  [1/20/89]
Desc: "Brief" Description of Density Code operation
 Res: Accepted for S2R7

X3T9.2/89-7            Date: 1/7/89   Author: P. Nitza  [1/20/89]
Desc: Terminate Immediate with Auto Sense
 Res: TERMINATE I/O PROCESS was accepted -- autosense rejected

X3T9.2/89-6            Date:          Author: K. Chan  [1/20/89]
Desc: Tape Read Density Reporting
 Res: Wording in 89-008 to be added to sequential-access model

X3T9.2/89-5            Date: 1/6/89   Author: K. Chan  [1/20/89]
Desc: Recommended Response Time after RST
 Res: Rejected by Jan '89 WG

X3T9.2/89-4 Rev 2      Date: 8/21/89  Author: P. Boulay  [9/11/89]
Desc: Proposed Single-Ended SCSI Bus Terminator
 Res: Accepted

X3T9.2/89-3            Date: 12/28/88 Author: D. Hatch  [1/20/89]
Desc: Ltr re signal integrity testing DAISY-GEN connector/possible proposal
 Res:

X3T9.2/89-2            Date: 12/22/88 Author: K. Kumazawa  [1/20/89]
Desc: ESDI "Index to Sector" Synchronization
 Res: Was included in ESDI

X3T9.2/89-1            Date: 1/3/89   Author: J. Lohmeyer  [3/17/89]
Desc: X3T9.2 1988 Annual Report
 Res: n.a.

X3T9.2/88-168          Date: 12/22/88 Author: B. Pentecost  [1/20/89]
Desc: AEN Initialization Procedure
 Res: Accepted for S2R7

X3T9.2/88-167          Date: 12/14/88 Author: S. Cornaby  [1/20/89]
Desc: Rotational Position Locking
 Res: rejected by January '89 working group

X3T9.2/88-166          Date: 12/9/88  Author: H. Waltersdorf  [1/20/89]
Desc: Cable Impedance
 Res:

X3T9.2/88-165 Rev 1    Date: 1/11/89  Author: K. Chan  [1/20/89]
Desc: Input current and resistor tolerances
 Res: Accepted with minor revisions for S2R7

X3T9.2/88-164          Date: 12/13/88 Author: Lamers/ Lohmeyer  [1/20/89]
Desc: X3T9.2 Meeting #79 Minutes -- December 5-6, 1988
 Res: n.a.

X3T9.2/88-163          Date: 12/6/88  Author: M. Gulick  [1/20/89]
Desc: New Device Type for DAT Devices in SCSI-3
 Res: Assigned to SCSI-3

X3T9.2/88-162          Date: 12/5/88  Author: J. McGrath  [1/20/89]
Desc: Terminate Immediate
 Res: see 88-164 item 9.7

X3T9.2/88-161          Date: 12/6/88  Author: P. Boulay  [1/20/89]
Desc: Single Ended Terminator Requirements
 Res: Accepted

X3T9.2/88-160          Date: 12/2/88  Author: D. Allan  [1/20/89]
Desc: Fiber Channel Description
 Res: n.a.

X3T9.2/88-159          Date: 12/5/88  Author: J. McGrath  [1/20/89]
Desc: Re: Power-on and Reset Response
 Res: See 88-164 item 9.6

X3T9.2/88-158 Rev 1    Date: 1/29/89  Author: S. Goldman  [3/17/89]
Desc: Terminate I/O Process Proposal
 Res: Feb '89 Plenary accepted Rev 1 for SCSI-2

X3T9.2/88-157          Date: 11/28/88 Author: J. Guennewig  [1/20/89]
Desc: Comments on unshielded connector figure 4-4
 Res: Rejected: Note 1 applies to back of connector--should clarify fig

X3T9.2/88-156          Date: 12/1/88  Author: J. Lohmeyer  [1/20/89]
Desc: Detect B Cable Proposal (Wide Data Transfer Option)
 Res: Rejected for SCSI-2

X3T9.2/88-155          Date: 11/14/88 Author: J. Stai  []
Desc: January Working Group Meeting Announcement
 Res: n.a.

X3T9.2/88-154          Date: 11/3/88  Author: J. Morse  [11/11/88]
Desc: Letter concerning connector/cable testing
 Res:

X3T9.2/88-153          Date: 11/9/88  Author: J. Lohmeyer  [11/11/88]
Desc: Austin Working Group Minutes
 Res: n.a.

X3T9.2/88-152          Date: 11/8/88  Author: J. Lohmeyer  [11/11/88]
Desc: Proposed revision to the SAVE DATA POINTER message
 Res: Austin WG: Function s/b moved to Device Disconnect-Reconnect Page

X3T9.2/88-151          Date:          Author: E. Reyner  [11/11/88]
Desc: More Single-ended Signal Simulation Results
 Res: Presented at Austin

X3T9.2/88-150          Date: 11/7/88  Author: K. Chan  [11/11/88]
Desc: SCSI Single-ended physical layer testing proposal
 Res:

X3T9.2/88-149          Date: 11/4/88  Author: M. Aarons  [11/11/88]
Desc: General Problems with Specification Implementation
 Res: Reviewed by Austin WG and appropriate changes made

X3T9.2/88-148          Date: 11/4/88  Author: D. Allan  [11/11/88]
Desc: SCSI-2 CAM Committee minutes of 10/19/88 meeting
 Res: n.a.

X3T9.2/88-147          Date: 11/4/88  Author: Maurer, Kodama, & Muething
[11/11/88]
Desc: SCSI Bus Transmission Line Analysis
 Res: WG recommends that the preliminary recommendations be accepted.
X3T9.2/88-146          Date: 10/24/88 Author: P. Bramhall  [11/11/88]
Desc: SCSI-2 Chapter 9 and DDS-Format Helical Scan Tape Drives
 Res:

X3T9.2/88-145 Rev 1    Date: 11/29/88 Author: J. Lawlor  [1/20/89]
Desc: Power-on and Reset Response.
 Res: Accepted with changes (see 88-164)

X3T9.2/88-144 Rev 1    Date: 12/5/88  Author: P. Boulay  [1/20/89]
Desc: Discussion of the C. Mollard termination scheme
 Res: 88-161 was accepted instead

X3T9.2/88-143          Date:          Author: B. Pentecost  [11/11/88]
Desc: Comments on SCSI-2 Rev 5
 Res: Addressed at Austin

X3T9.2/88-142          Date: 10/26/88 Author: C. Mollard  [10/31/88]
Desc: Single Ended Termination for SCSI-2
 Res: Assigned to Nov. WG and Dec. plenary

X3T9.2/88-141          Date: 10/18/88 Author: D. Hatch  [10/31/88]
Desc: Request to Present data on two-layer cable at December meeting
 Res:

X3T9.2/88-140          Date: 10/25/88 Author: P. Michels  [10/31/88]
Desc: Communications Device Model
 Res: Included in S2R6

X3T9.2/88-139          Date:          Author: W. Burr  [10/31/88]
Desc: A Rotating Direct Access Storage Functional Reference Model
 Res: Possible basis for direct-access device model

X3T9.2/88-138          Date: 10/20/88 Author: J. Semenak  [10/31/88]
Desc: SCSI-2 Revision 5, Section 9 comments
 Res: Some addressed in S2R6... remainder addressed at Austin

X3T9.2/88-137          Date: 10/20/88 Author: W. Smythe  [10/31/88]
Desc: Request to include reference to IT8 project in SCSI-2 appendix
 Res: To be considered for S2R7

X3T9.2/88-136          Date:          Author: D. Hatch  [10/31/88]
Desc: Stewart Stamping Connector Presentation October 1988
 Res: Rejected by Oct. plenary meeting

X3T9.2/88-135          Date: 10/14/88 Author: T. Wicklund  [10/31/88]
Desc: SCSI-2 Command Cross Reference
 Res:

X3T9.2/88-134          Date:          Author: B. Whiteman  [10/31/88]
Desc: SCSI-2 Daisy Chain Cabling Comparisons
 Res: Presented at Oct. plenary meeting

X3T9.2/88-133          Date:          Author: E. Reyner  [10/31/88]
Desc: Single-ended Signal Simulation Results
 Res: Presented at Oct plenary meeting

X3T9.2/88-132 Rev 1    Date: 10/11/88 Author: B. Pentecost  [10/31/88]
Desc: Parameter Pointer for Log Sense Command
 Res: Accepted for S2R6

X3T9.2/88-131          Date: 10/10/88 Author: J. Lohmeyer  [10/31/88]
Desc: Resolution of the ESDI Public Review Comments
 Res: n.a.

X3T9.2/88-130 Rev 1    Date: 10/31/88 Author: Lamers/ Lohmeyer  [10/31/88]
Desc: X3T9.2 Meeting #78 Minutes -- October 10-11, 1988
 Res: n.a.

X3T9.2/88-129          Date: 9/30/88  Author: R. Cummings  [10/31/88]
Desc: Fiber Optic Study Group minutes (Aug & Sep) plus mailing list
 Res: n.a.

X3T9.2/88-128          Date: 10/10/88 Author: D. Hatch  [10/31/88]
Desc: Stewart Connector presentation
 Res: Rejected by Oct. plenary meeting

X3T9.2/88-127          Date: 10/10/88 Author: G. Penokie  [10/31/88]
Desc: Error Handling Action Codes
 Res: Assigned as SCSI-3 agenda item

X3T9.2/88-126          Date: 10/5/88  Author: T. Wicklund  [10/31/88]
Desc: Comments on SCSI-2, Revision 5 document
 Res: Editors included at least part into S2R6... remainder?

X3T9.2/88-125          Date: 10/8/88  Author: B. Spence  [10/31/88]
Desc: Notice re the November X3T9.2 Working Group Meeting
 Res: n.a.

X3T9.2/88-124          Date: 10/6/88  Author: S. Cornaby  [10/31/88]
Desc: Progress Reporting
 Res: Assigned to Nov WG

X3T9.2/88-123          Date: 9/30/88  Author: D. Allan  [10/31/88]
Desc: Common Access Method Committee
 Res: n.a.

X3T9.2/88-122          Date: 9/20/88  Author: S. Jones  [10/31/88]
Desc: Change Definition vs. Inquiry Inconsistency
 Res: Assigned to Nov WG

X3T9.2/88-121          Date: 10/10/88 Author: P. Boulay  [10/31/88]
Desc: Disconnect Control via Mode Select
 Res: Accepted for S2R6

X3T9.2/88-120          Date: 10/9/88  Author: B. Spence  [10/31/88]
Desc: Data Pointer
 Res: In S2R6 -- Austin WG recommends function be moved to mode page

X3T9.2/88-119          Date: 9/29/88  Author: B. Weber  [10/31/88]
Desc: NCR Public Review comment on dpANS BSR X3.170-198X (ESDI 2.A)
 Res: Items 1, 2, and 4 accepted. Item 3 withdrawn.

X3T9.2/88-118          Date: 9/27/88  Author: J. Lohmeyer  [10/31/88]
Desc: Interpretation of the Connector Standing Rules
 Res: academic

X3T9.2/88-117          Date:          Author: J. Stai  [10/31/88]
Desc: Comments on the Stewart Stamping Connector Proposal
 Res: academic

X3T9.2/88-116          Date:          Author: J. Stai  [10/31/88]
Desc: Disable function for "IGNORE WIDE RESIDUE" message
 Res: October plenary didn't like this -- Jeff will re-propose

X3T9.2/88-115          Date:          Author: J. McGrath  [10/31/88]
Desc: SCSI-2 Implications for SCSI-3 Reconfiguration
 Res:

X3T9.2/88-114          Date:          Author: T. Wicklund  [9/9/88]
Desc: Comments on SCSI-2, Revision 5 document
 Res: Editors included some of this... remainder?

X3T9.2/88-113          Date: 9/7/88   Author: Wicklund & Weber  [9/9/88]
Desc: Proposal to clean up ESDI timing parameters
 Res: Accepted

X3T9.2/88-112          Date: 8/15/88  Author: R. Cummings  [9/9/88]
Desc: Highlights of 2nd Fiber Optic Study Group Meeting
 Res: n.a.

X3T9.2/88-111          Date: 9/2/88   Author: D. Hatch  [9/9/88]
Desc: Proposal to use the "DAISY-GEN" connector as the SCSI-2 internal cntr.
 Res: Rejected by October plenary meeting

X3T9.2/88-110          Date: 8/25/88  Author: D. Allan  [9/9/88]
Desc: ltr. to William Rinehuls regarding differences in ESDI document
 Res: His comment was withdrawn

X3T9.2/88-109 Rev 1    Date: 9/8/88   Author: L. Lamers  [9/9/88]
Desc: San Jose Working Group Minutes
 Res: n.a.

X3T9.2/88-108 Rev 2    Date: 10/16/88 Author: R. Snively  [10/31/88]
Desc: B Cable Data Transfer Requirements
 Res: Included in S2R6

X3T9.2/88-107 Rev 1    Date: 10/3/88  Author: B. Homans  [10/31/88]
Desc: Hierarchical Filemarks (Setmarks)
 Res: Included in S2R6

X3T9.2/88-106          Date: 5/24/88  Author: J. Schuessler  [9/9/88]
Desc: Electrical Test Results
 Res:

X3T9.2/88-105          Date: 8/29/88  Author: G. Fry  [9/9/88]
Desc: Direct-Access Device Model
 Res: Greg assigned to work on model (see 88-139)

X3T9.2/88-104          Date: 8/29/88  Author: A. Hospodor  [9/9/88]
Desc: Reporting Disk Rotation Speed
 Res: Did we do anything with this?

X3T9.2/88-103 Rev 2    Date: 11/9/88  Author: D. Davies  [1/20/89]
Desc: Generic Error Recovery Mode Page
 Res: Rejected

X3T9.2/88-102          Date: 8/18/88  Author: D. Allan  [9/9/88]
Desc: Ltr. to W. Rinehuls regarding his ESDI Comment
 Res: His comment was withdrawn

X3T9.2/88-101          Date: 8/15/88  Author: D. Barnum  [9/9/88]
Desc: Burndy proposal for a Microshield (tm) Interconnection System
 Res: Rejected by August plenary

X3T9.2/88-100          Date: 8/12/88  Author: J. McGrath  [9/9/88]
Desc: Changing SCSI IDs from non-unique ID configurations
 Res: Assigned to Autoconfiguration SSWG

X3T9.2/88-99           Date: 8/15/88  Author: Lamers / Lohmeyer  [9/9/88]
Desc: Auto-configuration SSWG Minutes August 15, 1988
 Res:

X3T9.2/88-98           Date: 8/5/88   Author: D. Allan  [9/9/88]
Desc: Comment on single-ended signals from Electronic Design Magazine
 Res: Assigned to Transmission Line SSWG

X3T9.2/88-97           Date: 8/2/88   Author: D. Allan  [9/9/88]
Desc: Comments on Autoconfiguration
 Res:

X3T9.2/88-96           Date: 8/16/88  Author: Lohmeyer/ Lamers  [9/9/88]
Desc: X3T9.2 Meeting #77 Minutes -- August 15-16, 1988
 Res: n.a.

X3T9.2/88-95 Rev 1     Date: 9/30/88  Author: B. Pentecost  [10/31/88]
Desc: LOG SELECT and LOG SENSE commands for Large Logs
 Res:

X3T9.2/88-94           Date: 8/12/88  Author: R. Kato  [9/9/88]
Desc: Changes to Medium Changer Command Set
 Res: Changer SSWG established to work on Medium Changer section

X3T9.2/88-93           Date: 8/9/88   Author: G. Penokie  [9/9/88]
Desc: SCSI-2 Proposal for Non-data Errors
 Res: HARDWARE ERROR added to list that return Actual Retry Count

X3T9.2/88-92           Date: 8/12/88  Author: P. Nitza  [9/9/88]
Desc: Auto Bus Configuration Proposal
 Res: Assigned to the autoconfiguration SSWG

X3T9.2/88-91           Date: 8/8/88   Author: J. Lohmeyer  [9/9/88]
Desc: Normalizing Wide Negotiation with Synchronous Negotiation
 Res: Accepted as corrected for S2R6

X3T9.2/88-90           Date: 7/27/88  Author: B. Driscoll  [9/9/88]
Desc: SCSI Additional Sense Codes
 Res:

X3T9.2/88-89           Date:          Author: T. Wicklund  [9/9/88]
Desc: Comments on ESDI standard X3T9.2/87-105 Rev 2.A
 Res: Treat as Public Review comment?

X3T9.2/88-88           Date: 7/18/88  Author: J. McGrath  [9/9/88]
Desc: Changing SCSI IDs from unique configuration
 Res:

X3T9.2/88-87           Date: 7/18/88  Author: J. Morse  [9/9/88]
Desc: TERMPWR Requirements for SCSI-2
 Res:

X3T9.2/88-86           Date: 6/30/88  Author: J. Stai  [7/18/88]
Desc: Vendor ID Code for ESDI
 Res:

X3T9.2/88-85           Date:          Author: D. Barnum  [7/18/88]
Desc: 60 Position Connector Proposal, SCSI-2
 Res:

X3T9.2/88-84           Date: 7/6/88   Author: D. McDonald  [7/18/88]
Desc: Re: Physical Architecture Proposal
 Res:

X3T9.2/88-83           Date: 6/30/88  Author: F. Berkowitz  [7/18/88]
Desc: Re: IBM 60 Pin SCSI Proposal
 Res:

X3T9.2/88-82           Date: 7/12/88  Author: S. Goldman  [7/18/88]
Desc: Sense Key - ASC - ASCQ Hierarchy
 Res: Editors to include in S2R5

X3T9.2/88-81 Rev 1     Date: 7/24/88  Author: B. Spence  [7/18/88]
Desc: LOG SELECT/SENSE Pages
 Res: This was revised by Bill and included in S2R5

X3T9.2/88-80 Rev 2     Date: 8/29/88  Author: G. Marazas  [9/9/88]
Desc: SCSI Device Connector Layout
 Res:

X3T9.2/88-79           Date: 7/7/88   Author: R. Snively  [7/18/88]
Desc: Review of SCSI-2 Rev 4
 Res: Resolved at July WG

X3T9.2/88-78           Date: 7/11/88  Author: J. Schuessler  [7/18/88]
Desc: Update to EDSI read-delay spec. (Proposing 12 bits instead of 9 bits)
 Res: Public review comment?

X3T9.2/88-77           Date: 7/7/88   Author: J. Morse  [7/18/88]
Desc: Definition of OPEN pins in SCSI-2 Cables
 Res: Added to August Agenda

X3T9.2/88-76           Date: 7/6/88   Author: F. Tabb  [7/18/88]
Desc: Preliminary test results on 28 AWG .025 center line cable
 Res: Characteristic impedance = 56 ohms

X3T9.2/88-75           Date: 6/17/88  Author: R. Cummings  [7/18/88]
Desc: Fiber Optic Study Group Minutes
 Res: n/a

X3T9.2/88-74           Date: 7/1/88   Author: D. Allan  [7/18/88]
Desc: Correction to ESDI Spindle Motor Control Option
 Res: Is this to be treated as a PR comment?

X3T9.2/88-73           Date: 6/30/88  Author: D. Allan  [7/18/88]
Desc: Revised ESDI Vendor Codes
 Res: to be added to BSR X3.170

X3T9.2/88-72           Date: 7/13/88  Author: Lohmeyer/ Lamers  [7/18/88]
Desc: Boise Working Group Meeting Minutes
 Res: n.a.

X3T9.2/88-71           Date: 6/28/88  Author: D. Allan  [7/18/88]
Desc: Comments on the IBM 60-pin proposal
 Res: Distributed to July WG

X3T9.2/88-70           Date: 6/17/88  Author: Anderson/ DeYoung  [7/18/88]
Desc: Additional Sense Qualifier Codes
 Res: July WG asked for specific ASCQs rather than generic

X3T9.2/88-69 Rev 2     Date: 8/29/88  Author: G. Marazas  [9/9/88]
Desc: Physical Architecture -- SCSI-2 Interface
 Res:

X3T9.2/88-68           Date: 6/17/88  Author: C. Brill  [7/18/88]
Desc: Alleged Patent Infringement
 Res: Says AMP is suing Steward Stamping over allegations

X3T9.2/88-67           Date: 6/13/88  Author: D. Hatch  [7/18/88]
Desc: Proposal to add Stewart/Viking connector to SCSI-2 as Alternative #1
 Res: Rejected by June Plenary

X3T9.2/88-66           Date: 6/21/88  Author: Lohmeyer/ Lamers  [7/18/88]
Desc: X3T9.2 Meeting #76 Minutes -- June 20-21, 1988
 Res: n.a.

X3T9.2/88-65 Rev 3     Date: 10/10/88 Author: P. Boulay  [10/31/88]
Desc: Asynchronous Event Notification Revision
 Res:

X3T9.2/88-64 Rev 1     Date: 10/21/88 Author: J. Stai  [10/31/88]
Desc: Proposed Model for Processor Devices
 Res:

X3T9.2/88-63           Date: 6/16/88  Author: J. Stai  [7/18/88]
Desc: SCSI Additional Sense Codes for Processor Devices
 Res: to be included in S2R5

X3T9.2/88-62           Date: 5/11/88  Author: Allan, Ullal, Polster  [5/18/88]
Desc: Fiber Working Group Meeting Announcement
 Res: n/a

X3T9.2/88-61           Date: 5/16/88  Author: J. Lohmeyer  [5/18/88]
Desc: Registration Authority for SCSI-2 and ESDI
 Res: Need to add procedures to SCSI-2 and ESDI

X3T9.2/88-60           Date: 5/13/88  Author: J. Lohmeyer  [5/18/88]
Desc: Active Termination for Differential B Cables
 Res: Accepted by June plenary

X3T9.2/88-59 Rev 1     Date: 5/26/88  Author: J. Lohmeyer  [7/18/88]
Desc: SDTR wording revisited (again and again) (and again)
 Res: to be included in S2R5

X3T9.2/88-58           Date: 5/5/88   Author: M. Raskin  [5/18/88]
Desc: Ltr., Raskin to AMP, Inc., requesting drawings and samples
 Res: n.a.

X3T9.2/88-57           Date: 5/15/88  Author: J. McGrath  [5/18/88]
Desc: Handling Illegal Pages in MODE SELECT/SENSE Commands
 Res: June plenary voted for CHECK CONDITION w/ ILLEGAL REQUEST

X3T9.2/88-56           Date: 5/9/88   Author: D. McIntyre  [5/18/88]
Desc: July 11-13 Working Group Meeting Announcement
 Res: n/a

X3T9.2/88-55           Date: 5/9/88   Author: J. McGrath  [5/18/88]
Desc: Advisory vs. Mandatory Bit in the Proposed Read Caching Page
 Res: May WG dropped this idea in favor of specific solutions

X3T9.2/88-54 Rev 1     Date: 7/6/88   Author: J. McGrath  [7/18/88]
Desc: August 29-31 Working Group meeting Announcement (Revised)
 Res: n/a

X3T9.2/88-53           Date: 5/8/88   Author: B. Spence  [5/18/88]
Desc: READ LOG/ACCESS LOG/LOG SENSE/SELECT Pages
 Res: Bill to update to reflect changes in LOG SELECT/SENSE

X3T9.2/88-52           Date: 5/4/88   Author: C. Hess  [5/18/88]
Desc: Density Code for Helical Scan Digital Recording Devices
 Res: WG recommends adding this Density Code

X3T9.2/88-51           Date: 4/29/88  Author: D. Allan  [5/18/88]
Desc: SCSI Gender-Mender
 Res: Distributed in May mailing

X3T9.2/88-50           Date: 5/11/88  Author: J. Lohmeyer  [5/18/88]
Desc: Minneapolis Working Group Meeting Minutes
 Res: n/a

X3T9.2/88-49 Rev 2     Date: 5/13/88  Author: J. McGrath  [5/18/88]
Desc: Proposed Read Caching Page
 Res: WG recommends Rev 2 be accepted

X3T9.2/88-48 Rev 1     Date: 6/16/88  Author: J. Morse  [7/18/88]
Desc: SCSI-2 Pinouts for Low and High Density Cables
 Res: Pinouts included in S2R5, except OPENs for future TERMPWR

X3T9.2/88-47           Date: 4/22/88  Author: R. Schlitzkus  [5/18/88]
Desc: FORMAT TRACK Command for Floppy Disk Drives
 Res: Not much enthusiasm for this proposal

X3T9.2/88-46           Date: 4/22/88  Author: R. Liu  [5/18/88]
Desc: MODE SELECT/SENSE Cache Control Page
 Res: Included in 88-49

X3T9.2/88-45           Date: 4/22/88  Author: D. Smith  [5/18/88]
Desc: Alleged Patent Infringement
 Res: Says AMP doesn't infringe Stewart's patents (see 88-34)

X3T9.2/88-44           Date: 4/25/88  Author: P. Boulay  [5/18/88]
Desc: WORM Device Specific MODE SELECT Page
 Res: Accepted for S2R5 by July WG

X3T9.2/88-43           Date:          Author: D. Davies  [5/18/88]
Desc: MODE SELECT Clarification
 Res: Davies to prepare rev 1 -- WG recommends accepting 88-43R1

X3T9.2/88-42           Date:          Author: D. Davies  [5/18/88]
Desc: Sequential-Access Device Initialization Procedure
 Res: WG recommends acceptance

X3T9.2/88-41           Date: 4/25/88  Author: D. Davies  [5/18/88]
Desc: READ SILI Implementation Requirement
 Res: Davies to draft implementors note

X3T9.2/88-40           Date:          Author: Lohmeyer/Lamers  [5/18/88]
Desc: X3T9.2 Meeting #75 Minutes -- April 25-26, 1988
 Res: n/a

X3T9.2/88-39           Date: 4/18/88  Author: B. Weber  [5/18/88]
Desc: Proposed clarification to ESDI
 Res: NCR to review and submit PR comment if they still want change

X3T9.2/88-38           Date: 4/23/88  Author: J. McGrath  [5/18/88]
Desc: Rev 4 Issues - Sections 7 and 8
 Res: See 88-050 Item 4 for resolution

X3T9.2/88-37           Date: 4/18/88  Author: B. Spence  [5/18/88]
Desc: Synchronous ACK Edge Proposal
 Res: accepted by 4/88 plenary

X3T9.2/88-36           Date: 3/16/88  Author: D. McFadden  [3/23/88]
Desc: ltr enclosing Honda connector drawings for SCSI-2 high-density connectr
 Res: does this need any resolution?

X3T9.2/88-35           Date:          Author: M. Pullam  [3/23/88]
Desc: ltr regarding JAE compatibility with SCSI-2 high-density connector
 Res: n/a

X3T9.2/88-34           Date: 3/16/88  Author: M. Raskin  [3/23/88]
Desc: ltr, Stewart to AMP, saying high-density connector infringes patents
 Res: AMP says they don't infringe (see 88-45)

X3T9.2/88-33           Date: 2/22/88  Author: C. Brill  [3/23/88]
Desc: AMP statement concerning patents on the Amplimite .050 Series connector
 Res: States there are no patents on intermating dimensions

X3T9.2/88-32 Rev 1     Date: 5/12/88  Author: J. Lohmeyer  [5/18/88]
Desc: Additional Sense Code Spreadsheet
 Res: Accepted by June plenary for S2R5

X3T9.2/88-31           Date: 3/14/88  Author: Lamers,Stai,Lohmeyer  [3/23/88]
Desc: Newport Beach Working Group Minutes
 Res: n/a

X3T9.2/88-30 Rev 1     Date: 4/23/88  Author: J.McGrath  [5/18/88]
Desc: Proposed Definition of Caching
 Res: May WG recommends including in S2R5

X3T9.2/88-29           Date: 3/7/88   Author: P. Boulay  [3/23/88]
Desc: REQUEST SENSE Clarification
 Res: Accepted for rev 4

X3T9.2/88-28           Date: 3/1/88   Author: J. McGrath  [3/23/88]
Desc: Proposed wording for new Unit Attention Conditions
 Res: Resolved in Mar88 WG for Rev 4

X3T9.2/88-27           Date: 2/24/88  Author: G. Houlder  [3/23/88]
Desc: MODE SELECT rewording on saving pages and non-changeable parameters
 Res: Partially accepted--Plenary rejected nonchangable param proposal

X3T9.2/88-26           Date: 2/24/88  Author: G. Houlder  [3/23/88]
Desc: UNIT ATTENTION rewording to include new attentions
 Res: Accepted with minor changes -- Rev 4

X3T9.2/88-25 Rev 1     Date: 3/9/88   Author: B. Mortensen  [3/23/88]
Desc: Rotational Position Locking
 Res: Accepted for rev 4

X3T9.2/88-24           Date: 2/22/88  Author: D. McIntyre  [3/23/88]
Desc: Unimplemented Page Request Response
 Res: Accepted and later rejected by June plenary

X3T9.2/88-23           Date: 2/19/88  Author: R. Snively  [3/23/88]
Desc: Consideration of phase definitions
 Res: Accepted as modified for Rev 4

X3T9.2/88-22           Date: 2/18/88  Author: D. Appleyard  [3/23/88]
Desc: RECOVER BUFFERED DATA Command for Sequential Access Devices
 Res: Modified version included in S2R5

X3T9.2/88-21           Date: 2/18/88  Author: D. Appleyard  [3/23/88]
Desc: WRITE Command for Sequential Access Devices
 Res: Accepted for rev 4

X3T9.2/88-20 Rev 1     Date: 4/25/88  Author: J. Lohmeyer  [3/23/88]
Desc: X3T9.2 Meeting #74 Minutes -- February 22-23, 1988
 Res: rev 1: Corrected minutes of Phoenix meeting

X3T9.2/88-19           Date: 2/8/88   Author: G. Houlder  [3/23/88]
Desc: May 9-11 Working Group Meeting Announcement
 Res: n/a

X3T9.2/88-18           Date: 2/2/88   Author: B. Spence  [2/23/88]
Desc: Follow-up report on study of miniature shielded connectors
 Res: n/a

X3T9.2/88-17 Rev 1     Date: 2/8/88   Author: J. Lohmeyer  [3/23/88]
Desc: X3T9.2 1987 Annual Report
 Res: n/a

X3T9.2/88-16           Date: 1/28/88  Author: D. Davies  [3/23/88]
Desc: Autosense Protocol
 Res: Autosense deleted in Rev 4

X3T9.2/88-15           Date: 1/28/88  Author: D. Davies  [3/23/88]
Desc: PF bit Requirement in MODE SENSE
 Res: PF bit deleted in Rev 4

X3T9.2/88-14           Date: 1/20/88  Author: W. Smythe  [3/23/88]
Desc: ltr, Smythe to Lohmeyer, regarding IT8 liaison with X3T9.2
 Res: n/a

X3T9.2/88-13           Date: 1/15/88  Author: B. Driscoll  [1/20/88]
Desc: ltr to Scanner group warning of potential changes
 Res: Changes were not made

X3T9.2/88-12           Date: 1/19/88  Author: J. Farnsworth  [1/20/88]
Desc: Request for Clarification of FORMAT UNIT command
 Res: Accepted for Rev 4

X3T9.2/88-11           Date: 1/18/88  Author: L. Lamers  [1/20/88]
Desc: SCSI-2 Working Group meeting minutes - San Jose
 Res: n/a

X3T9.2/88-10           Date: 1/11/88  Author: J. Stai  [1/20/88]
Desc: March Working Group Meeting Announcement
 Res: n/a

X3T9.2/88-9 Rev 1      Date: 3/3/88   Author: D. Anderson  [3/23/88]
Desc: Target message response clarification
 Res: Accepted as modified 3/88 for Rev 4

X3T9.2/88-8            Date: 5/14/86  Author: R. Snively  [1/20/88]
Desc: SET THRESHOLD and READ/RESET USAGE COUNTER commands
 Res: Part of LOG SELECT/SENSE SWIG

X3T9.2/88-7            Date: 11/25/87 Author: P. Boulay  [1/20/88]
Desc: Relative Address Bit Unnecessarily Restricted??
 Res: Deferred to SCSI-3

X3T9.2/88-6 Rev 2      Date: 7/11/88  Author: J. McGrath  [7/18/88]
Desc: LOG SELECT and LOG SENSE commands
 Res: Jim plans to revise based on July WG comments

X3T9.2/88-5            Date: 1/7/88   Author: J. Stai  [1/20/88]
Desc: CHANGE DEFINITION/INQUIRY modifications
 Res: Accepted for Rev 4

X3T9.2/88-4            Date: 1/7/88   Author: P. Johansson  [1/20/88]
Desc: Management of the "Grown" Defect List
 Res: Revised at Mar88 WG partially included in Rev 4; rest in Rev 5

X3T9.2/88-3            Date: 1/4/88   Author: J. McGrath  [1/20/88]
Desc: Questions concerning section 5 of SCSI-2 Rev 3
 Res: Resolved in rev 4

X3T9.2/88-2            Date: 1/6/88   Author: J. Stai  [1/20/88]
Desc: SEARCH command modifications
 Res: Deferred to SCSI-3

X3T9.2/88-1            Date: 1/6/88   Author: J. Stai  [1/20/88]
Desc: UPDATE BLOCK modifications
 Res: Accepted for rev 4

X3T9.2/87-217          Date: 12/5/87  Author: D. McIntyre  [1/20/88]
Desc: Scatter/Gather Media Access Commands
 Res:

X3T9.2/87-216          Date: 1/6/88   Author: J. Schuessler  [1/20/88]
Desc: "Temporary" document on Assertion/Negation times
 Res:

X3T9.2/87-215 Rev 1    Date: 1/19/88  Author: B. Spence  [1/20/88]
Desc: Drawing the line on SCSI-2
 Res:

X3T9.2/87-214          Date: 12/29/87 Author: B. Spence  [1/20/88]
Desc: Target message response clarification
 Res:

X3T9.2/87-213          Date: 12/28/87 Author: B. Spence  [1/20/88]
Desc: MESSAGE PARITY ERROR message clarification
 Res:

X3T9.2/87-212          Date: 12/23/87 Author: B. Spence  [1/20/88]
Desc: SDTR Message Clarification Number 6
 Res:

X3T9.2/87-211          Date: 10/25/87 Author: D. Hatch  [1/20/88]
Desc: Questionnaire on proposed SCSI-2 .050 centered I/O connector
 Res:

X3T9.2/87-210 Rev 2    Date: 3/6/88   Author: P. Boulay  []
Desc: SCSI-2 CD-ROM Command Set Proposal
 Res: Accepted for rev 4

X3T9.2/87-209          Date: 11/16/87 Author: Anderson/Eneboe  [1/20/88]
Desc: WRITE SAME Command
 Res:

X3T9.2/87-208          Date: 12/2/87  Author: Anderson/Eneboe  [1/20/88]
Desc: Write Same capability in SEND/RECEIVE DIAG commands
 Res:

X3T9.2/87-207          Date: 12/3/87  Author: D. Harms  [1/20/88]
Desc: Cable B Connector Pin Assignments
 Res:

X3T9.2/87-206          Date: 12/4/87  Author: Harms/Kellogg  [1/20/88]
Desc: More than 8 devices per bus for Wide SCSI
 Res:

X3T9.2/87-205          Date: 12/4/87  Author: J. Semenak  [1/20/88]
Desc: SCSI REQUEST SENSE Residue
 Res:

X3T9.2/87-204          Date: 12/7/87  Author: R. Lui  [1/20/88]
Desc: Comment on MODE SELECT Command
 Res: Accepted at Dec '87 plenary

X3T9.2/87-203          Date: 12/6/87  Author: G. Floryance  [1/20/88]
Desc: LOAD SKIP MASK Command
 Res:

X3T9.2/87-202 Rev 1    Date: 1/28/88  Author: D. Davies  [3/23/88]
Desc: MODE SELECT Page 02h, Maximum Burst Size Definition
 Res: Revised version accepted for Rev 4

X3T9.2/87-201          Date: 12/3/87  Author: J. Lohmeyer  [1/20/88]
Desc: ltr to W. Smythe, IT8, concerning X3T9.2 liaison
 Res:

X3T9.2/87-200 Rev 1    Date: 1/5/88   Author: J. Lohmeyer  [1/20/88]
Desc: X3T9.2 Meeting #73 Minutes -- December 7-8, 1987
 Res:

X3T9.2/87-199          Date: 12/1/87  Author: B. Spence  [1/20/88]
Desc: Further Clarification of SDTR Protocol
 Res:

X3T9.2/87-198          Date: 11/30/87 Author: B. Spence  [1/20/88]
Desc: Report on Study of Miniature Shielded Connector Proposals
 Res:

X3T9.2/87-197          Date: 11/25/87 Author: J. Lohmeyer  [1/20/88]
Desc: SCSI Arbitration Timing Problem
 Res:

X3T9.2/87-196          Date: 11/9/87  Author: W. Smythe  [1/20/88]
Desc: Liaison Information from IT8
 Res:

X3T9.2/87-195 Rev 3    Date: 1/12/88  Author: J. Schuessler  [1/20/88]
Desc: Proposed Text for Fast SCSI
 Res:

X3T9.2/87-194          Date: 10/30/87 Author: W. Smythe  [1/20/88]
Desc: ltr to C. Kachurik requesting IT8/X3T9.2 formal liaison
 Res:

X3T9.2/87-193 Rev 1    Date: 1/19/88  Author: G. Milligan  [1/20/88]
Desc: SCSI-3 Project Proposal
 Res:

X3T9.2/87-192 Rev 3    Date: 5/8/88   Author: J. Semenak  [5/18/88]
Desc: Proposal on returning additional BUSY information
 Res: Jim has retracted this proposal

X3T9.2/87-191          Date: 10/30/87 Author: R. Snively  [11/6/87]
Desc: January 1988 SCSI-2 Working Group Announcement
 Res:

X3T9.2/87-190          Date: 10/28/87 Author: G. Stephens  [11/6/87]
Desc: Deferred Error Information Bits
 Res:

X3T9.2/87-189          Date: 10/10/87 Author: G. Floryance  [11/6/87]
Desc: General Comments on SCSI-2
 Res:

X3T9.2/87-188          Date: 10/22/87 Author: R. Snively  [11/6/87]
Desc: Explicit selection of target functions
 Res:

X3T9.2/87-187 Rev 1    Date: 10/27/87 Author: G. Stephens  [11/6/87]
Desc: MEDIUM CHANGER DEVICE CLASS MODEL
 Res:

X3T9.2/87-186          Date: 10/24/87 Author: B. Spence  [11/6/87]
Desc: Proposed SEND DIAGNOSTIC Command Pages
 Res:

X3T9.2/87-185          Date: 10/28/87 Author: J. Lohmeyer  [11/6/87]
Desc: Minutes of Orlando Working Group October 26-28, 1987
 Res:

X3T9.2/87-184          Date: 10/23/87 Author: B. Spence  [11/6/87]
Desc: Reconcilation of Sequential-Access positional terms - Step 2
 Res:

X3T9.2/87-183          Date: 10/20/87 Author: J. Lohmeyer  [11/6/87]
Desc: Ltr to William Smythe, IT8, enclosing SCSI-2, 87-162, and mtg notice
 Res:

X3T9.2/87-182          Date: 10/20/87 Author: W. Smythe  [11/6/87]
Desc: Ltr from IT8 requesting SCSI-2 draft document
 Res:

X3T9.2/87-181          Date: 10/5/87  Author: J. Masiewicz  [11/6/87]
Desc: Optional Wide Data Transfer Option
 Res:

X3T9.2/87-180 Rev 1    Date: 10/22/87 Author: G. Floryance  [11/6/87]
Desc: Format Progress Reporting
 Res:

X3T9.2/87-179 Rev 3    Date: 10/28/87 Author: R. Snively  [11/6/87]
Desc: Explicit control of extended contingent allegiance
 Res:

X3T9.2/87-178          Date: 9/30/87  Author: R. Snively  [11/6/87]
Desc: Clarification of Reset Operation
 Res:

X3T9.2/87-177 Rev 1    Date: 10/11/87 Author: B. Spence  [11/6/87]
Desc: Proposed Direct-Access MODE SELECT Page 01h Modifications
 Res:

X3T9.2/87-176          Date: 10/10/87 Author: B. Spence  [11/6/87]
Desc: Reconciliation of Sequential-Access Positional Terms--Step 1
 Res:

X3T9.2/87-175          Date: 10/9/87  Author: J. Schuessler  [11/6/87]
Desc: Fast SCSI Parameter Selection
 Res:

X3T9.2/87-174          Date:          Author: S. Goldman  [11/6/87]
Desc: IGNORE WIDE RESIDUE Message
 Res:

X3T9.2/87-173 Rev 1    Date: 10/1/87  Author: D. Pope  [11/6/87]
Desc: Write Same capability in SEND/RECEIVE DIAGNOSTIC vs WRITE
 Res:

X3T9.2/87-172          Date:          Author: P. Boulay  [11/6/87]
Desc: Buffer Empty Ratio and Buffer Full Ratio
 Res:

X3T9.2/87-171          Date: 10/13/87 Author: J. Lohmeyer  [11/6/87]
Desc: X3T9.2 Meeting #72 Minutes -- October 12-13, 1987
 Res:

X3T9.2/87-170          Date: 10/5/87  Author: C. Brill  [11/6/87]
Desc: ltr to Dal Allan enclosing ESDI Connector drawings
 Res:

X3T9.2/87-169 Rev 2    Date: 11/22/87 Author: G. Houlder  [1/20/88]
Desc: Pinouts for Double Density Alternative 2 Connector
 Res:

X3T9.2/87-168          Date: 9/21/87  Author: Japan (SC13)  [11/6/87]
Desc: SCSI-2 Proposals from Japanese Host-Adapter Implementers
 Res:

X3T9.2/87-167 Rev 1    Date: 2/26/88  Author: G. Houlder  [3/23/88]
Desc: Suggested changes to the MODE SELECT command
 Res: Parts accepted (see Mar 88 WG minutes -- item 5)

X3T9.2/87-166 Rev 1    Date: 10/12/87 Author: P. Boulay  [11/6/87]
Desc: Comments on Optical Sections of SCSI-2 (Ref 87-146 R1)
 Res:

X3T9.2/87-165          Date:          Author: S. Goldman  [9/14/87]
Desc: Orlando Working Group Announcement
 Res:

X3T9.2/87-164          Date: 9/10/87  Author: R. Herron  [9/14/87]
Desc: Miniaturized Delta Ribbon connector proposal for SCSI-2
 Res:

X3T9.2/87-163          Date: 9/10/87  Author: G. Houlder  [9/14/87]
Desc: Proper Response for Nonchangable Mode Parameters
 Res:

X3T9.2/87-162          Date: 9/9/87   Author: B. Driscoll  [9/14/87]
Desc: Cmnd Desc. for Scanner Devices (proposed section for SCSI-2 Rev 3)
 Res:

X3T9.2/87-161          Date: 6/3/87   Author: V. Henriques  [9/14/87]
Desc: 1988-1989 Service Fees
 Res: We pay more next year...

X3T9.2/87-160          Date: 9/8/87   Author: J. Stai  [9/14/87]
Desc: Working Group Cabling Report
 Res:

X3T9.2/87-159          Date: 8/27/87  Author: S. Jones  [9/14/87]
Desc: Self Configuration Errors
 Res:

X3T9.2/87-158          Date:          Author: G. Houlder  [9/14/87]
Desc: Proposed Additional Sense Code Table for Section 8
 Res:

X3T9.2/87-157 Rev 2    Date: 10/28/87 Author: J. McGrath  [11/6/87]
Desc: Providing Initiators with Zoning (or Notched Drive) Information
 Res:

X3T9.2/87-156 Rev 1    Date: 10/26/87 Author: J. McGrath  [11/6/87]
Desc: Reordering of Commands in Command Queuing
 Res:

X3T9.2/87-155          Date: 8/25/87  Author: R. Weber  [9/14/87]
Desc: Ending Extended Contingent Allegiance
 Res:

X3T9.2/87-154 Rev 2    Date: 10/11/87 Author: D. McIntyre  [11/6/87]
Desc: Clarification of Synchronous Data Transfer Negotiation
 Res:

X3T9.2/87-153 Rev 1    Date: 9/7/87   Author: L. Lamers  [9/14/87]
Desc: Minutes of SCSI-2 Working Group Meeting Aug 31 - Sept 2, 1987
 Res:

X3T9.2/87-152          Date: 8/27/87  Author: D. Appleyard  [9/14/87]
Desc: Response to REQUEST SENSE before CHECK CONDITION has been reported
 Res:

X3T9.2/87-151          Date: 8/28/87  Author: P. Johansson  [9/14/87]
Desc: Management of the "Grown" Defect List
 Res: Also see 88-004

X3T9.2/87-150          Date: 8/28/87  Author: P. Johansson  [9/14/87]
Desc: Translate Page in SEND/RECEIVE DIAGGNOSTIC Commands
 Res:

X3T9.2/87-149          Date: 8/28/87  Author: P. Johansson  [9/14/87]
Desc: Differentiation of Controller BUSY and LUN BUSY
 Res:

X3T9.2/87-148          Date: 8/25/87  Author: J. Schuessler  [9/14/87]
Desc: Twisted Pair Cable Specification and Fast SCSI Changes
 Res:

X3T9.2/87-147 Rev 1    Date: 9/9/87   Author: B. Spence  [9/14/87]
Desc: Codification of TEST UNIT READY returned Status and Sense Data
 Res:

X3T9.2/87-146 Rev 1    Date: 9/10/87  Author: J. Stai  [9/14/87]
Desc: Revised Optical Sections 12,13,15
 Res:

X3T9.2/87-145 Rev 1    Date: 10/11/87 Author: E. Hunt  [11/6/87]
Desc: Request for assignment of a Sequential Access Density Code
 Res: Rev 0 Accepted -- Rev 1 provides name "DAT Data Storage (DDS)"

X3T9.2/87-144          Date: 8/14/87  Author: D. Appleyard  [9/14/87]
Desc: Additions to the Automatic Medium Changer Command Set
 Res:

X3T9.2/87-143          Date: 8/17/87  Author: E. Reynolds  [9/14/87]
Desc: AMP AMPLIMATE .050 Series Connectors
 Res:

X3T9.2/87-142          Date: 8/17/87  Author: D. Tolmie  [9/14/87]
Desc: HSC Goals and Assumptions
 Res:

X3T9.2/87-141          Date: 8/12/87  Author: D. Allan  [9/14/87]
Desc: Comments on ESDI Document X3T9.3/87-005 Rev 1.3
 Res:

X3T9.2/87-140          Date: 8/13/87  Author: G. Milligan  [9/14/87]
Desc: Review of ESDI X3T9.3/87-005 Rev 1.3
 Res:

X3T9.2/87-139 Rev 1    Date: 8/27/87  Author: D. Appleyard  [9/14/87]
Desc: Additions to READ POSITION command for Sequential Access Devices
 Res:

X3T9.2/87-138          Date: 8/17/87  Author: J. Schuessler  [9/14/87]
Desc: Fast SCSI
 Res:

X3T9.2/87-137 Rev 2    Date: 10/23/87 Author: R. Snively  [11/6/87]
Desc: Programmable Control of SCSI operating mode
 Res:

X3T9.2/87-136          Date: 8/13/87  Author: R. Snively  [9/14/87]
Desc: Study of IPI-SCSI queuing functions
 Res:

X3T9.2/87-135          Date: 9/4/87   Author: Nitza/Lohmeyer  [9/14/87]
Desc: X3T9.2 Meeting #71 Minutes -- Aug 17-18, 1987
 Res: N/A

X3T9.2/87-134          Date: 8/5/87   Author: R. Cummings  [9/14/87]
Desc: Minutes of IPI/HSC Working Group -- July 16-17, 1987
 Res:

X3T9.2/87-133          Date: 8/14/87  Author: G. Marazas  [9/14/87]
Desc: Proposal for a high-density shielded SCSI-2 connector
 Res:

X3T9.2/87-132          Date: 8/11/87  Author: H. Waltersdorf  [9/14/87]
Desc: Comments on ESDI connector drawings
 Res:

X3T9.2/87-131 Rev 3    Date: 11/17/87 Author: P. Boulay  [1/20/88]
Desc: MODE SELECT Implementations to Support COPY
 Res:

X3T9.2/87-130          Date: 8/10/87  Author: P. Nitza  [9/14/87]
Desc: Target Implemented Options in INQUIRY and MODE SELECT/SENSE
 Res:

X3T9.2/87-129          Date: 7/27/87  Author: P. Nitza  [9/14/87]
Desc: MODE SELECT/SENSE Verify Error Recovery Page
 Res:

X3T9.2/87-128          Date: 8/6/87   Author: P. Nitza  [9/14/87]
Desc: SEARCH Command Modifications
 Res:

X3T9.2/87-127          Date: 8/8/87   Author: P. Nitza  [9/14/87]
Desc: INQUIRY Command with VPD information
 Res:

X3T9.2/87-126          Date: 8/9/87   Author: P. Nitza  [9/14/87]
Desc: SEND/RECEIVE DIAGNOSTIC commands with Translate Page
 Res:

X3T9.2/87-125 Rev 8    Date: 6/17/88  Author: J. Lohmeyer  [7/18/88]
Desc: SCSI-2 Vendor Identification Codes for INQUIRY Data
 Res: Future updates will be maintained as part of the SCSI-2 draft doc

X3T9.2/87-124          Date: 6/15/87  Author: C. Kachurik  [9/14/87]
Desc: Revision 1 to SD-2, Organization and Procedures
 Res: N/A

X3T9.2/87-123          Date: 6/8/87   Author: Dal & J. Ullal  [7/20/87]
Desc: High Speed WG meeting notice & minutes of May WG
 Res:

X3T9.2/87-122 Rev 2    Date: 8/31/87  Author: J. McGrath  [9/14/87]
Desc: MODE SELECT command modifications
 Res:

X3T9.2/87-121 Rev 1    Date: 9/4/87   Author: L. Lamers  [9/14/87]
Desc: File Name Conventions
 Res: N/A

X3T9.2/87-120          Date: 7/13/87  Author: J. Patton  [7/20/87]
Desc: TRANSLATE command proposal
 Res:

X3T9.2/87-119          Date: 7/9/87   Author: B. Raudebaugh  [7/20/87]
Desc: Additions to the Automatic Medium Changer proposal
 Res:

X3T9.2/87-118          Date: 7/13/87  Author: J. Schuessler  [7/20/87]
Desc: Wide SCSI Cabling Proposal
 Res:

X3T9.2/87-117          Date: 7/7/87   Author: P. Johansson  [7/20/87]
Desc: Proposed Addition to the INQUIRY Command
 Res:

X3T9.2/87-116 Rev 1    Date: 7/15/87  Author: D. Anderson  [9/14/87]
Desc: Passing Media Initialization Pattern during FORMAT UNIT command
 Res: Rev 1 included in SCSI-2 Rev 2

X3T9.2/87-115 Rev 2    Date: 1/7/88   Author: D. Anderson  [1/20/88]
Desc: Flexible Disk Drive I/F, Pin 1 Definition - MODE SENSE/SELECT, Page 5
 Res:

X3T9.2/87-114          Date: 7/10/87  Author: R. Weber  [7/20/87]
Desc: Corrections to Additional Sense Codes for Sequential-Access Devices
 Res:

X3T9.2/87-113          Date: 6/10/87  Author: R. Weber  [7/20/87]
Desc: Sequential-Access Device Recoverable Error Counters
 Res:

X3T9.2/87-112          Date: 7/14/87  Author: J. Stai  [7/20/87]
Desc: FORMAT UNIT command new wording
 Res:

X3T9.2/87-111          Date: 7/13/87  Author: J. Stai  [7/20/87]
Desc: WRITE AND VERIFY command new wording
 Res:

X3T9.2/87-110          Date: 7/7/87   Author: D. McIntyre  [7/20/87]
Desc: SCSI-2 Group 1, 2, and 5 Command Descriptor Blocks
 Res:

X3T9.2/87-109          Date: 7/9/87   Author: B. Spence  [7/20/87]
Desc: Additional Concerns RE IMMEDIATE-BIT Operations
 Res:

X3T9.2/87-108          Date: 7/10/87  Author: G. Stephens  [7/20/87]
Desc: Buffer Device Recovery after CHECK CONDITION
 Res:

X3T9.2/87-107          Date: 7/15/87  Author: J. Lohmeyer  [7/20/87]
Desc: Minutes of SCSI-2 Working Group July 13-15, 1987
 Res: N/A

X3T9.2/87-106 Rev 1    Date: 12/2/87  Author: L. Lamers  [1/20/88]
Desc: Proposal for CD-ROM in SCSI-2
 Res:

X3T9.2/87-105 Rev 3A   Date: 6/23/89  Author: D. Allan  [7/17/89]
Desc: Enhanced Small Device Interface (ESDI)
 Res:

X3T9.2/87-104          Date: 7/10/87  Author: J. Lohmeyer  [7/20/87]
Desc: SCSI-2 Working Group Notice -- Aug 31 - Sept 2
 Res: N/A

X3T9.2/87-103 Rev 1    Date: 8/13/87  Author: J. Lohmeyer  [9/14/87]
Desc: NCR Printer Proposal for SCSI-2
 Res:

X3T9.2/87-102          Date: 7/1/87   Author: D. Skinner  [7/20/87]
Desc: Proposal on discarding VOLUME OVERFLOW data
 Res: Accepted

X3T9.2/87-101          Date: 7/1/87   Author: D. Skinner  [7/20/87]
Desc: Tape buffer control (size and EOT handling)
 Res: Accepted

X3T9.2/87-100          Date: 7/1/87   Author: R. Schultz  [7/20/87]
Desc: Media Changer Issue
 Res:

X3T9.2/87-99           Date: 6/30/87  Author: R. Schultz  [7/20/87]
Desc: Terminator Power
 Res:

X3T9.2/87-98 Rev 2     Date: 10/12/87 Author: D. Davies  [11/6/87]
Desc: Sequential Access Buffered Mode Two
 Res:

X3T9.2/87-97           Date: 6/22/87  Author: D. Davies  [7/20/87]
Desc: Clarification of Additional Sense Codes for BLANK CHECK
 Res:

X3T9.2/87-96           Date: 6/19/87  Author: G. Stephens  [7/20/87]
Desc: Revised Tape Model Text
 Res:

X3T9.2/87-95           Date: 6/19/87  Author: G. Stephens  [7/20/87]
Desc: MODE SELECT Changes Causing a UNIT ATTENTION condition for Tape Devices
 Res:

X3T9.2/87-94           Date: 6/21/87  Author: D. McIntyre  [7/20/87]
Desc: REASSIGN BLOCKS revision
 Res: Included in Rev 2

X3T9.2/87-93           Date: 6/19/87  Author: G. Stephens  [7/20/87]
Desc: Sequential Access Device Position Definition
 Res:

X3T9.2/87-92           Date: 6/19/87  Author: G. Stephens  [7/20/87]
Desc: SCSI Interface Redefined Similarly to IPI Level 1
 Res: To be held over for SCSI-3 consideration

X3T9.2/87-91           Date: 6/19/87  Author: P. Nitza  [7/20/87]
Desc: MODE SELECT Error Recovery Parameter Combinations
 Res:

X3T9.2/87-90           Date:          Author: L. Lamers  [7/20/87]
Desc: X3T9.2 (#70) & X3T9.3 (#62) Joint Minutes June 22-23, 1987
 Res: N/A

X3T9.2/87-89           Date: 6/19/87  Author: J. Patton  [7/20/87]
Desc: Potential Flaw Management Problem
 Res: See 87-120

X3T9.2/87-88           Date: 6/9/87   Author: B. Spence  [7/20/87]
Desc: Immediate bit in Tape WRITE FILEMARKS and VERIFY Comands
 Res: Accepted

X3T9.2/87-87           Date: 4/21/87  Author: C. Kachurik  [7/20/87]
Desc: Order Form for revised Master Plan SD-1, May 1987, Rev 1
 Res: N/A

X3T9.2/87-86           Date: 5/7/86   Author: G. Milligan  [5/26/87]
Desc: SMD Connector Corrections for X3.91M-1987 final edit
 Res: Corrections will be made during the final edit.

X3T9.2/87-85           Date: 5/25/87  Author: J. Stai  [5/26/87]
Desc: July SCSI-2 Working Group Meeting Notice
 Res: N/A

X3T9.2/87-84           Date: 5/18/87  Author: A. Kozlowski  [5/26/87]
Desc: Peripheral Device Type for Direct-Access Tape Devices
 Res: Deferred to July W.G.

X3T9.2/87-83           Date: 5/18/87  Author: A. Kozlowski  [5/26/87]
Desc: Certification Pattern Page 6 of MODE SELECT/SENSE
 Res: Initialization pattern added to FORMAT UNIT in Rev 2

X3T9.2/87-82           Date: 5/7/87   Author: R. Schultz  [5/26/87]
Desc: Merged Tape and Disk Additional Sense Codes
 Res: See W.G. minutes (87-80) item 17.

X3T9.2/87-81           Date:          Author:   []
Desc: Void -- Document Number not assigned
 Res:

X3T9.2/87-80           Date: 5/20/87  Author: J. Lohmeyer  [5/26/87]
Desc: Minutes of SCSI-2 Working Group May 18-20, 1987
 Res: N/A

X3T9.2/87-79           Date: 3/25/87  Author: E. Hunt  [5/26/87]
Desc: Proposed Rewording of Section 9.1.8 (Page 9-15 in Rev 0)
 Res: Accepted for inclusion in Rev 2

X3T9.2/87-78           Date: 5/8/87   Author: R. Schultz  [5/26/87]
Desc: Miscellaneous corrections to SCSI-2 Rev 1
 Res: Some accepted, others stimulated much debate see 87-80 item 23

X3T9.2/87-77 Rev 1     Date: 6/20/87  Author: P. Nitza  [7/20/87]
Desc: INQUIRY Peripheral Device Type Proposal
 Res: Accepted with changes -- This is the revision

X3T9.2/87-76 Rev 1     Date: 6/18/87  Author: P. Nitza  [7/20/87]
Desc: Auto Sense and MODE SELECT/SENSE Target Option Proposal
 Res: Revised -- see W.G. minutes (87-80) item 22.

X3T9.2/87-75           Date: 5/13/87  Author: R. Weber  [5/26/87]
Desc: Miscellaneous Sequential-Access comments
 Res: See W.G. minutes (87-80) item 21.

X3T9.2/87-74           Date: 5/15/87  Author: S. Jones  [5/26/87]
Desc: Revised Media Changer Proposal from Working Group
 Res: To be reviewed at Vancouver (Skip to add Model info)

X3T9.2/87-73           Date: 5/6/87   Author: J. Hoy  []
Desc: Section 15 with commands in Alphabetical Order
 Res:

X3T9.2/87-72           Date: 4/1/87   Author: J. Hoy  [5/26/87]
Desc: Optical Disk proposed 12-byte command set
 Res: Sent to W.G. for review (Deferred -- John not present)

X3T9.2/87-71           Date: 5/21/87  Author: A. Girton  [5/26/87]
Desc: X3T9.2 (#69) & X3T9.3 (#61) joint minutes April 27-28, 1987
 Res: N/A

X3T9.2/87-70           Date: 4/23/87  Author: D. Davies  [5/26/87]
Desc: Resolution of reservation problem in the COPY command
 Res: Rejected--Multi-init systems can avoid problem by using RESERVE

X3T9.2/87-69           Date: 4/17/87  Author: S. Goldman  [5/26/87]
Desc: Wide SCSI text to accompany 87-36 for an appendix
 Res: Sent to W.G. for review (Deferred -- Steve not present)

X3T9.2/87-68           Date: 4/24/87  Author: L. Domshy  [5/26/87]
Desc: Proposed Sequential-Access density codes (QIC-150,-300,-600)
 Res: Accepted

X3T9.2/87-67           Date: 4/1/87   Author: D. Tolmie  [5/26/87]
Desc: Minutes IPI/SCSI Higher Speed Working Group
 Res: Another working group scheduled for 5/14-15/87

X3T9.2/87-66           Date: 4/27/87  Author: B. Spence  [5/26/87]
Desc: Tape Write EOT Sense Key (Propose: VOLUME OVERFLOW)
 Res: Accepted

X3T9.2/87-65 Rev 1     Date: 5/21/87  Author: B. Spence  [5/26/87]
Desc: Terms for a tape glossary
 Res: Sent to working group for review

X3T9.2/87-64           Date: 4/20/87  Author: S. Jones  [5/26/87]
Desc: Operating modes after hard RESET
 Res: Accepted

X3T9.2/87-63           Date: 4/20/87  Author: S. Jones  [5/26/87]
Desc: READ UPDATED BLOCKS Command Proposal (Revised from 87-39)
 Res: Skip to revise to make mult block optional

X3T9.2/87-62           Date:          Author: G. Milligan  [5/26/87]
Desc: SMD Connector Presentation--Made at 4/27/87 meeting
 Res: Gene authorized to make correction during final edit

X3T9.2/87-61           Date: 4/16/87  Author: P. Boulay  [5/26/87]
Desc: SCSI-2 Broadcast capability
 Res: Withdrawn by Paul

X3T9.2/87-60           Date: 4/15/87  Author: P. Boulay  [5/26/87]
Desc: SCSI-2 Identification of REQUEST SENSE response
 Res: Sent to W.G. for review (part of level/version issue)

X3T9.2/87-59 Rev 4     Date: 10/1/87  Author: Queuing W.G.  [11/6/87]
Desc: Command Queuing proposal for SCSI-2
 Res:

X3T9.2/87-58           Date: 3/20/87  Author: G. Houlder  [3/26/87]
Desc: May 18-20, 1987 Working Group meeting notice
 Res: N/A

X3T9.2/87-57           Date: 3/15/87  Author: C. Warren  [3/26/87]
Desc: Ltr to J. Lohmeyer on P-1134 Status and Printer Proposal
 Res:

X3T9.2/87-56           Date: 3/21/87  Author: J. Lohmeyer  [3/26/87]
Desc: SCSI-2 Ad-Hoc Minutes  March 18-20, 1987  Tempe, AZ
 Res: N/A

X3T9.2/87-55           Date: 3/10/87  Author: R. Snively  [3/26/87]
Desc: Clarification of BUS FREE definition
 Res: Included in SCSI-2 Rev 1 -- Still question of wording clarity

X3T9.2/87-54           Date: 3/13/87  Author: R. Snively  [3/26/87]
Desc: Full command queueing proposal
 Res: See 87-59

X3T9.2/87-53 Rev 1     Date: 4/9/87   Author: R. Snively  [5/26/87]
Desc: Appendix on Power-On protocols
 Res: Sent to May W.G. (which deferred it)

X3T9.2/87-52 Rev 1     Date: 8/13/87  Author: R. Snively  [9/14/87]
Desc: Asynchronous event notification
 Res:

X3T9.2/87-51           Date: 3/9/87   Author: R. Snively  [3/26/87]
Desc: Clarification of invalid LUN
 Res: Some of this is in SCSI-2 Rev 1 -- Does it need further work?

X3T9.2/87-50           Date: 3/6/87   Author: R. Snively  [3/26/87]
Desc: Compatability Philosophy between SCSI & SCSI-2
 Res: Included in the Scope of SCSI-2 Rev 1

X3T9.2/87-49           Date: 3/18/87  Author: J. McGrath  [3/26/87]
Desc: Command Queueing proposal
 Res: See 87-59

X3T9.2/87-48           Date: 3/14/87  Author: D. Loski  [3/26/87]
Desc: MODE SENSE options page Ah
 Res: See 87-130

X3T9.2/87-47           Date: 3/14/87  Author: D. Loski  [3/26/87]
Desc: Certification Pattern
 Res: Sent to May W.G. (which deferred it -- Daniel not present)

X3T9.2/87-46           Date: 3/15/87  Author: P. Nitza  [3/26/87]
Desc: SCSI command queueing
 Res: See 87-59

X3T9.2/87-45           Date: 3/16/87  Author: M. Brown  [3/26/87]
Desc: SCSI-2 Optical command set
 Res: March W.G. rejected most of this -- Remainder???

X3T9.2/87-44           Date:          Author: D. Kinsell  [3/26/87]
Desc: Cabling requirements
 Res: Parts have been accepted

X3T9.2/87-43 Rev 2     Date: 9/4/87   Author: G. Floryance  [9/14/87]
Desc: Revised Common READ LOG command
 Res: This proposal was translated to WordStar by L. Lamers

X3T9.2/87-42           Date: 3/18/87  Author: G. Floryance  [3/26/87]
Desc: INQUIRY command enhancements
 Res: Greg is revising this -- Controller addressability issue

X3T9.2/87-41           Date: 3/17/87  Author: J. Semenek  [3/26/87]
Desc: MODE SENSE command changes
 Res: ???

X3T9.2/87-40           Date: 3/17/87  Author: J. Semenek  [3/26/87]
Desc: REQUEST SENSE command changes
 Res: Implementors note about returned bytes added to Rev 1

X3T9.2/87-39           Date: 3/11/87  Author: S. Jones  [3/26/87]
Desc: READ UPDATED BLOCKS command
 Res: Still being revised -- see 87-63

X3T9.2/87-38           Date: 3/10/87  Author: S. Jones  [3/26/87]
Desc: Changes to Automatic Medium Changer (ref 87-17)
 Res: Still at W.G. (See 87-74)

X3T9.2/87-37           Date: 3/13/87  Author: D. Pope  [3/26/87]
Desc: ERASE Command
 Res: Accepted with some changes for inclusion in SCSI-2 Rev 1

X3T9.2/87-36           Date: 3/10/87  Author: S. Goldman  [3/26/87]
Desc: Wide SCSI Implementation
 Res: Part of future appendix -- see 87-69

X3T9.2/87-35           Date: 3/10/87  Author: F. Ross  [3/26/87]
Desc: Request for 1988 Meeting Hosts
 Res: Distributed

X3T9.2/87-34           Date:          Author: D. Loski  [3/26/87]
Desc: Recommended software driver command sequence following power-on/reset
 Res: At W.G. -- Also see 87-53 Rev 1

X3T9.2/87-33           Date: 3/10/87  Author: G. Houlder  [3/26/87]
Desc: Clarify Synchronous Data Transfer Description
 Res: Included in SCSI-2 Rev 1 (Jeff Stai may have issue with wording.)

X3T9.2/87-32           Date:          Author: K. Van de Poel  [3/26/87]
Desc: SCSI Scanner Command Set comments
 Res: To Scanner W.G.

X3T9.2/87-31           Date: 1/16/87  Author: B. Caldwell  [3/26/87]
Desc: Emulex acceptance of X3T9.2 Secretary position (Rich Notari)
 Res: More work for Emulex

X3T9.2/87-30           Date: 2/20/87  Author: S. Allen  [3/26/87]
Desc: Appointment of J. Lohmeyer as Chair of X3T9.2
 Res: More work for John

X3T9.2/87-29 Rev 1     Date: 3/26/87  Author: A. Girton  [3/26/87]
Desc: Minutes of X3T9.2 Meeting #68, Feb. 16-17, 1987, Clearwater Beach, FL
 Res: Accepted with minor changes

X3T9.2/87-28           Date: 3/10/87  Author: G. Houlder  [3/26/87]
Desc: Proposed Implementors Notes for Differential Cables and Drivers.
 Res: Accepted for inclusion in SCSI-2 Rev 1

X3T9.2/87-27           Date: 3/6/87   Author: G. Houlder  [3/26/87]
Desc: Clarification of Invalid LUN reporting
 Res: See 87-51

X3T9.2/87-26           Date: 2/13/87  Author: C. Skeldon  [3/26/87]
Desc: Flat Cable Problems in Differential SCSI
 Res: Note added to SCSI-2 Rev 1

X3T9.2/87-25           Date: 2/16/87  Author: D. Tolmie  [3/26/87]
Desc: High Speed Open Channel Proposal (Paper)
 Res: X3T9.3 issue

X3T9.2/87-24           Date: 2/16/87  Author: D. Tolmie  [3/26/87]
Desc: High Speed Open Channel Proposal (Slides)
 Res: X3T9.3 issue

X3T9.2/87-23           Date:          Author: D. McIntyre  [3/26/87]
Desc: Proposed SCSI Logo
 Res: Accepted for eventual inclusion in an appendix

X3T9.2/87-22           Date: 2/12/87  Author: L. Edwards  [3/26/87]
Desc: Optical Disconnect/Reconnect Page Parameters Alternative Proposal
 Res: 87-10 accepted instead of this proposal

X3T9.2/87-21 Rev 1     Date:          Author: D. Loski  [3/26/87]
Desc: Revised SCSI Bus Phase Sequencing
 Res: Accepted -- Paul Nitza is revising to ASCII format

X3T9.2/87-20           Date: 2/13/87  Author: R. Snively  [3/26/87]
Desc: Consideration of Off-line bits for SEND DIAGNOSTIC
 Res: Included in SCSI-2 Rev 1

X3T9.2/87-19 Rev 1     Date: 2/19/88  Author: R. Snively  [3/23/88]
Desc: Consideration of Deferred Error Presentation
 Res: Accepted in SCSI-2 Rev 4 as revised 3/88

X3T9.2/87-18           Date: 2/11/87  Author: T. Johnson  [3/26/87]
Desc: Flexible Disk Parameters for MODE SELECT
 Res: Included in SCSI-2 Rev 1

X3T9.2/87-17           Date: 2/11/87  Author: M. Rudy  [3/26/87]
Desc: Proposal for Optical Disk Changers
 Res: Mar W.G. issue: Device vs IQ command set -- see 87-74

X3T9.2/87-16           Date: 2/13/87  Author: J. Lohmeyer  [3/26/87]
Desc: Proposed Wording for Section 6.1.3 (Ref: X3T9.2/86-82)
 Res: Included in Revision 1 of SCSI-2

X3T9.2/87-15           Date: 2/13/87  Author: J. Semenak  [3/26/87]
Desc: SCSI INQUIRY Command
 Res: Issue still open -- Jeff Stai may prepare a proposal

X3T9.2/87-14           Date: 2/16/87  Author: D. Davies  [3/26/87]
Desc: RESERVE UNIT Command Deficiency
 Res: W.G. recommended avoiding problem -- see 87-70

X3T9.2/87-13           Date: 2/14/87  Author: J. Lohmeyer  [3/26/87]
Desc: Sense Key Specific Bytes
 Res: Accepted for inclusion in Rev 1

X3T9.2/87-12           Date: 1/27/87  Author: P. Boulay  [3/26/87]
Desc: Optical Media Scan Command
 Res: Accepted for inclusion in Rev 1

X3T9.2/87-11           Date: 1/27/87  Author: P. Boulay  [3/26/87]
Desc: Update Block Command
 Res: Accepted for inclusion in Rev 1

X3T9.2/87-10           Date: 2/11/87  Author: L. Edwards  [3/26/87]
Desc: Optical Disconnect/Reconnect Page Parameters
 Res: Accepted with some additions

X3T9.2/87-9            Date: 1/22/87  Author: J. Schuessler  [3/26/87]
Desc: 16-bit SCSI Example Block Diagram
 Res: Superseded by 87-36

X3T9.2/87-8            Date: 1/27/87  Author: J. Hoy  [3/26/87]
Desc: Memo re: Read Defect Data Command (37h) for Optical Storage Devices
 Res: Current Section 8 command is OK for Optical Devices

X3T9.2/87-7 Rev 3      Date: 6/26/87  Author: D. W. Spence  [7/20/87]
Desc: Revised proposal for downloading microcode.
 Res: Rev 3 includes the June 87 plenary comments

X3T9.2/87-6 Rev 1      Date: 2/18/87  Author: W. Burr  [3/26/87]
Desc: X3T9.2  X3 Annual Report for 1986
 Res: N/A

X3T9.2/87-5            Date: 1/28/87  Author: P. Boulay  []
Desc: Proposals from the Optical Working Group - Cover Letter (see 87-11,12)
 Res: N/A

X3T9.2/87-4            Date: 1/16/87  Author: R. Schultz  []
Desc: Proposal for Communications Devices in SCSI-2
 Res: Accepted -- Was included in Rev 1

X3T9.2/87-3            Date: 1/20/87  Author: L. Lamers  [3/26/87]
Desc: Memo to B. Burr, re Optical Ad-Hoc Minutes - 01/19/87 to 01/20/87
 Res: N/A

X3T9.2/87-2            Date: 1/13/87  Author: J. Lohmeyer  [1/14/87]
Desc: Memo to B. Burr, re Jan. 7-9 1987 SCSI-2 Working Group Meeting Minutes
 Res: N/A

X3T9.2/87-1            Date:          Author: J Schuessler  [1/14/87]
Desc: Ltr. to X3T9.2 members, re: Jitter and Skew Budget for High Speed SCSI
 Res: High-Speed Ad Hoc assigned to generate proposal.





















































































