Return-path: X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests) ID ; Tue, 27 Feb 90 02:27:53 -0500 (EST) Message-ID: Reply-To: space+@Andrew.CMU.EDU From: space-request+@Andrew.CMU.EDU To: space+@Andrew.CMU.EDU Date: Tue, 27 Feb 90 02:27:30 -0500 (EST) Subject: SPACE Digest V11 #86 SPACE Digest Volume 11 : Issue 86 Today's Topics: LOG Payload Status for 02/26/90 (Forwarded) ---------------------------------------------------------------------- Date: Mon, 26 Feb 90 17:04:22 LOCAL From: COP90187%UCF1VM.BITNET@mitvma.mit.edu Mmdf-Warning: Parse error in original version of preceding line at lcs.mit.edu Subject: LOG qq ------------------------------ Date: 26 Feb 90 21:59:38 GMT From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov (Peter E. Yee) Subject: Payload Status for 02/26/90 (Forwarded) Daily Status/KSC Payload Management and Operations 02-26-90 - STS-31R HST (at VPF) - On Friday access was removed along with aft shroud closeout. On Saturday solar array closeout was started. Today the GSFC CTV will be disconnected, the HGA coupler will be removed, and the HST potentiometer will be replaced. - STS-32R SYNCOM/LDEF (at SAEF-2) LDEF deintegration continues. - STS-35 ASTRO-1/BBXRT (at O&C) - BBXRT clearance checks were worked yesterday and will continue today, along with velcro patch installations, and payload envelope clearance checks. - STS-40 SLS-1 (at O&C) - The systems test was active Friday and will continue today. Experiment functional checks will also continue today. On Saturday the I/O unit was changed out, cable isolation checks were performed, and pyro control and caution and warning panels were removed. These panels will be reinstated today. - STS-42 IML (at O&C) - Staging activities were performed on racks 4 and 8 Friday. On Saturday staging was performed on racks 3, 9, and 11. Today racks 7 and 11 staging operations will be performed. - STS-45 Atlas-1 (at o&C) - Pallet keel installation and orthogrid hardpoint installation operations were worked Friday. Today pallets 1 and 2 will be repositioned on the mid-east rails. - STS-46 TSS-1 (at O&C) - PPCU checkout was worked Friday. No scheduled activity for today. ------------------------------ End of SPACE Digest V11 #86 *******************